URBAN WOODS PHASE 1 is a residential gated-community project comprising villas in SHAMSHABAD, Shamshabad Mandal, Ranga Reddy District, developed by registered promoter SREE CHAITANYA CONSTRUCTIONS. The registered land area is 4402.71 sq mts, with 16 residential buildings, each Ground Floor + 2 Upper Floors, and a separate ground-floor AMENITIES building. The RERA unit record lists 48 4BHK units. Its TG-RERA registration number is P02400010841, and the promoter’s completion undertaking is 01.04.2031.

More from Sree Chaitanya Constructions · 2 projects →

At a glance

RERA registration
P02400010841
Registration valid
01/04/2026 to 01/04/2031, unless extended by the Authority. This is the registration-validity period, not a statement that the project has an occupancy certificate.
Promoter
SREE CHAITANYA CONSTRUCTIONS
Site area
RERA land record: Total Area 4402.71 sq mts, Net Area 4402.71 sq mts, affected area 0. Filed permit and layout drawing separately state site area 4645.97 sq.
Building permit
HMDA technical approval and Peddatupra Gram Panchayat permit order; Layout Permit 1950/HMDA/SWDL/2026, with application/file reference 011899/HMDA/03498/SWDL/SHZ/2025.
Construction stage
Construction progress is not established by the supplied evidence. Permit conditions set a commencement deadline of 28/09/2026; no site-progress verification is supplied.
Occupancy certificate
No occupancy or completion certificate is recorded in the supplied material; the permit requires an occupancy certificate before occupation.

The full project file

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

Urban Woods Phase 1 is a residential villa project recorded as a new project in its RERA filing. The filing records 48 homes across 17 tower/block entries on 4,402.71 sq m of land, with proposed completion on 1 August 2031.

Project type
Residential (villa)RERA filing
Units
48RERA filing
Towers
1 tower blockssquareyards
Land area
4402.71 sq mRERA filing
Possession
01/08/2031RERA filing
Status
New ProjectRERA filing

Configurations & sizes

The approved drawings show 1BHK configurations with measured carpet areas of 54.0–73.9 sq m; this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawings. The TG-RERA filing records 48 4BHK homes, 0 booked, with a saleable area of 86.69 sq m each; the developer's marketing advertises 3BHK and 4BHK villa sizes.

TypeSaleableSource
4BHK86.69 sq mRERA filing
3 BHK Villa2774 Sq. Ft.magicbricks
4 BHK Villa2845 Sq. Ft.squareyards

Amenities

The disclosed amenities and infrastructure include community, green-space and utility provisions.

13 amenities
  • Green Strip/TOT LOT/Park
  • Community Buildings
  • Water Storage
  • Waste Disposal
  • Community Hall
  • children's play area
  • Avenue plantation
  • Entrance arch
  • Kids' Play Areas / Sand Pits
  • Power Backup
  • 24 x 7 Security
  • CCTV / Video Surveillance
  • Normal Park / Central Green

Specifications

Master Bedroom-Flooring
Vitrified Tiles
Master Bedroom-Walls
Oil Bound Distemper
roads
40-foot and 33-foot-wide blacktop roads
Structure
RCC Frame Structure
utilities
There are drainage and water systems under the ground for every plot.

Location & connectivity

The project is described in marketing as being in Peddatopra, Hyderabad, along the Srisailam Highway corridor; the RERA filing identifies the village as pedda thupra, Shamshabad mandal, Ranga Reddy district. Marketing lists Tukkuguda ORR Junction at around 12–14 km, Hyderabad Pharma City at around 15–18 km, Kothur Railway Station at almost 34 km, Gachibowli at approximately 40–45 km from the chosen ORR exit point, and Rajiv Gandhi International Airport at 35–40 minutes by the ORR corridor.

pedda thupra, Shamshabad, Ranga Reddy
📍 Open in Maps

Promoter

The promoter is SREE CHAITANYA CONSTRUCTIONS, recorded as a partnership. The digest records 3 other registered projects; V PRASAD is named as architect and KRISHNAKANTH as structural engineer.

SREE CHAITANYA CONSTRUCTIONS
3 other projects on record

Additional details

Launched Apr 2026magicbricks

Filed vs marketed

The TG-RERA filing records 48 total units, while Magicbricks markets 17 and Square Yards shows 17 in one figure and 16 in another; the filing records 48 villas, while Square Yards markets 16, and land area is shown as 1 acre on one source and 1.08 acres on another.

  • Total units: magicbricks says 17; the RERA filing says 48. magicbricks
  • Total villas: squareyards says 16; the RERA filing says 48. squareyards
  • Land area: squareyards says 1.08 Acres; we show 1 Acre. squareyards
  • Total units: squareyards says 16; we show 17. squareyards
The RERA filing is the legally binding record.

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
URBAN WOODS PHASE 1
Developer / Promoter
SREE CHAITANYA CONSTRUCTIONS
Project type
Residential
RERA Registration No.
P02400010841
Registration Status
New Project
Approved on
01/04/2026
Proposed completion
01/08/2031
Approving authority
HMDA
Plan approval no.
011899/HMDA/03498/SWDL/SHZ/2025
Total site area
4,403 sq m (1.1 acres)
Approved built-up area
4,183 sq m (1.0 acres)
Buildings (approved plan)
17
Locality
SHAMSHABAD, pedda thupra
Mandal
Shamshabad
District
Rangareddy
PIN code
509325
Documents on File
19

Other registrations of Urban Woods

Frequently asked questions

Is URBAN WOODS PHASE 1 registered with Telangana RERA?

Yes. URBAN WOODS PHASE 1 is registered with the Telangana Real Estate Regulatory Authority as P02400010841; the registration status is New Project.

Who is the developer of URBAN WOODS PHASE 1?

The promoter named in the RERA registration is SREE CHAITANYA CONSTRUCTIONS.

Where is URBAN WOODS PHASE 1 located?

URBAN WOODS PHASE 1 is in SHAMSHABAD, pedda thupra, Rangareddy, Telangana (509325).

When will URBAN WOODS PHASE 1 be completed?

The promoter's proposed date of completion filed with RERA is 01/08/2031. This is the promoter's declaration, not a guarantee.