The Harvest

PCH OFFICE SPACES LLP · Rangareddy · RERA P02400004833

THE HARVEST is a commercial project in NARSINGI MUNCIPALITY-ORRGC MANDAL, Ranga Reddy district, developed by registered promoter PCH OFFICE SPACES LLP. The site area is 13,047.83 sq. m., and the RERA filing records one building with 37 commercial units, each with a saleable area of 3689.3 sq. m.; the HMDA technical approval describes 3Cellar + 1Ground + 22 Upper floors. The project is registered with TG-RERA under P02400004833, and the RERA header records proposed completion **25/10/2027**.

1. Project at a glance

Project identity

FieldProject record
Registered project nameTHE HARVEST RERA record
Project type / registered portionCommercial project; one building is recorded. RERA record RERA filing RERA filing
TG-RERA registration numberP02400004833 RERA record
Registration validity01/08/2022 to 25/06/2027; this is the registration period, not a statement that the building is complete or occupied. RERA record
Registered promoterPCH OFFICE SPACES LLP, an LLP. RERA record Corporate record
RERA statusThe filing identifies the project as “New Project”; a TG-RERA FORM ‘C’ registration certificate is supplied. RERA filing

Land and geographic identity

FieldProject record
Locality / villageRERA filing locality: NARSINGI MUNCIPALITY-ORRGC MANDAL. The HMDA approval and project environmental documents identify Kokapet-ORRGC Village / Kokapet Village. RERA record RERA filing
MandalRERA locality text includes “ORRGC MANDAL”; the HMDA approval identifies Narsingi Muncipality-ORRGC Mandal, and environmental documents identify Gandipet Mandal. RERA record
District / PINRanga Reddy; 500075. RERA record
Survey numbers / subdivisions101/U/2 and 101/A (PART); also presented in the RERA filing as 101/U/2 & 101/A (PART). RERA record RERA filing
Total site area13,047.83 sq. m. RERA filing
Area affected / net areaRERA filing: 1,983.92 sq. m. affected and 11,063.91 sq. m. net. The HMDA approval records 1,983.91 Sq.mtrs handed over for the proposed 30 mtrs master-plan road and an approved site extent of 11,063.91 Sq. Mt. RERA filing
Boundaries in RERA filingEast: OTHERS LAND; west: OTHERS LAND; north: WIDE ROAD; south: OTHERS LAND. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal approvalHyderabad Metropolitan Development Authority (HMDA); Technical approval No. 031393/SKP/C1/U6/HMDA/05122019, dated 25/06/2021. Approvals record
Approved built-up areaThe HMDA technical approval extraction records Built up Area 84877.61 and Proposed Built-up Area 96421.35; the available excerpt does not further define these area categories.
Building count / sanctioned configurationOne commercial building is recorded in the RERA filing. The HMDA technical approval describes 3Cellar + 1Ground + 22 Upper floors. RERA filing
Environmental approval configurationThe supplied SEIAA amendment to environmental clearance dated 28/05/2025 records 4 B + 4 S + 31 Upper Floors (2 TDR) + Terrace Floor. The supplied 2026 document is an amendment to Terms of Reference for a revised mixed-use office-and-hotel configuration; it is not an environmental clearance.
ParkingHMDA approval states cellar and stilt areas approved for parking, but the supplied HMDA extraction does not give a parking-space count. The 2025 environmental-clearance amendment records Total parking area (including stack parking): 61,315.97 sqm and 4W – 2,045 & 2W - 302.
Approved versus RERA-declared unitsThe RERA filing records 37 commercial units; the HMDA approval condition says the sanctioned number of units must not be increased without prior approval, but its extracted text does not state the sanctioned unit count. RERA unit details

Offering and status

FieldProject record
Unit type and RERA-filed saleable areaCommercial units; 37 units, each recorded with saleable area 3689.3 sq. m. in the normalized RERA unit data. RERA unit details RERA unit table
Booked / available9 booked; 28 available, as last read from the TG-RERA portal. The record provides no as-of date, so counts are indicative. RERA unit table
Construction stageNot established by the supplied evidence; no current construction-progress percentage or independent site inspection is provided. RERA unit table Document index
Completion datesForm-B declaration dated 04.05.2022 undertakes completion by 25TH day of JUNE 2027. The RERA project header records proposed completion 25/10/2027. These are filed/declaration dates, not confirmation of completion. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project records. The HMDA approval says an occupancy certificate is required before occupation.

2. The project story

THE HARVEST is registered with TG-RERA as a commercial development promoted by PCH OFFICE SPACES LLP. The RERA filing identifies survey numbers 101/U/2 and 101/A (PART) and a single building. The supplied HMDA technical approval describes a commercial office building, while the environmental-clearance amendment dated 28/05/2025 describes a 4 B + 4 S + 31 Upper Floors (2 TDR) + Terrace Floor configuration. The RERA unit record lists 37 commercial units, with 9 booked and 28 available at the last portal reading; the date of that reading is not supplied. The available evidence does not establish present construction progress or confirm that any portion has been completed or occupied. The 2026 SEIAA document concerns an amendment to Terms of Reference for a mixed-use office-and-hotel configuration, rather than a completed construction or occupancy record. RERA record RERA filing RERA unit table

3. Master plan, architecture & building design

The RERA land record states a total site area of 13,047.83 sq. m., with 1,983.92 sq. m. affected and a net area of 11,063.91 sq. m. The HMDA technical approval describes the approved extent as 11,063.91 Sq. Mt. and records 1,983.91 Sq.mtrs as road-affected area handed over to the local body through registered gift deed 8326/2020, dated 23.12.2020. RERA filing

The HMDA approval extraction gives Built up Area 84877.61 and Proposed Built-up Area 96421.35. It describes one building with 3Cellar + 1Ground + 22 Upper floors. Separately, the 2025 SEIAA environmental-clearance amendment records 4 B + 4 S + 31 Upper Floors (2 TDR) + Terrace Floor, total built-up area including parking of 1,83,806.35 sqm, and total parking area including stack parking of 61,315.97 sqm. These are document-specific recorded parameters; the supplied material does not provide a drawing-based breakdown of footprint, floor-by-floor areas, office floors, common areas, or floor arrangement.

The 2026 SEIAA document records a proposed Mixed Use (Office cum Hotel) scheme and lists 600 hotel rooms. That document is an amendment to Terms of Reference and should not be read as evidence that the revised configuration has been environmentally cleared or constructed. The supplied floor-plan set contains 10 drawings: 4 scans pending measurement and 6 with no flats; none were software-measured. Floor plans

4. Homes, configurations & floor plans

This is a commercial project; the RERA unit record lists commercial units, not homes. Filed saleable area and inventory are as follows. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Commercial379283689.3 sq. m. per unit, as recordedNot availableNot supplied

The RERA filing does not provide measured carpet area in the supplied unit record. The available floor-plan material has not produced software-measured unit areas or room dimensions. Saleable area is the RERA-filed figure; it should not be treated as carpet area or a drawing-based measurement. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA technical approval states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. It also requires the approved internal circulation pattern and earmarked parking area to be maintained.

The 28/05/2025 environmental-clearance amendment records 61,315.97 sqm of total parking area, including stack parking, and provision for 4W – 2,045 & 2W - 302. The separate 2024 ToR amendment lists Total Parking Area (Sqm) (Including Stack Parking): Proposed 61,315.97; EC Obtained 43,087.00 and No. of Vehicles in Parking: Proposed 4W – 2,045 & 2W - 302; EC Obtained 4W – 1,923 & 2W - 361. These environmental-document figures do not establish individual allotment or exclusive ownership of a parking bay. The supplied records do not describe visitor or accessible-space allocation, ramp locations, pedestrian separation, or EV charging.

6. Amenities, recreation & open spaces

The following are recorded in the supplied RERA and approval material. RERA’s amenity record marks the listed facilities as available in the filing, but the supplied entries show 0 progress; they do not establish completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsNo size suppliedRERA amenities recordListed as available; progress 0; completion not independently verified. RERA amenities
Green strip / TOT LOT / parkNo size suppliedRERA amenities recordListed as available; progress 0; completion not independently verified. RERA amenities
Community buildingsNo details or size suppliedRERA amenities recordEntry present; no progress or completion evidence supplied. RERA amenities
Street lightingNo details suppliedRERA amenities recordEntry present; progress 0; completion not independently verified. RERA amenities

The HMDA approval requires the open space shown in the site layout plan to be maintained and developed as open space with greenery, but the supplied materials do not provide its area or a detailed recreation-facility schedule.

7. Utilities, building services & safety

The HMDA technical approval lists a transformer, garbage house, rainwater-harvesting structure, sewage-treatment plant (STP), solar water-heating system, solar lighting, refuse chute, and separate underground and terrace water-storage tanks of 25,000 lts. capacity each. These are approval-recorded provisions, not evidence of installation or operation.

The 28/05/2025 SEIAA environmental-clearance amendment records total water requirement 919 KLD, comprising fresh water 514 KLD and recycled water 405 KLD; sewage generation 793 KLD; and STP capacity 960 KLD. Its conditions require an STP maintenance contract for a minimum of 10 years, proper sewage treatment and maximum reuse for gardening/avenue plantation, and water and sewerage connections from HMWS&SB or the local municipality.

The HMDA approval requires provisions for a transformer and garbage house and requires the applicant to fulfil conditions of Fire Service NOCs, Airport NOCs and SEIAA clearance. The supplied records do not establish the number or capacity of lifts, backup-power capacity, fire-system equipment or clearance status, CCTV/security systems, accessibility provisions, or completed utility connections.

8. Location, access & connectivity

The RERA location record identifies NARSINGI MUNCIPALITY-ORRGC MANDAL, Ranga Reddy district, PIN 500075, and the land record gives survey numbers 101/U/2 and 101/A (PART). The HMDA and environmental documents place the site at Kokapet/Kokapet-ORRGC Village. RERA record RERA filing

The HMDA approval refers to a proposed 30 mtrs master-plan road and records the affected area as handed over to the local body through gift deed 8326/2020. The location dataset gives the following mapped distances from the cadastral parcel centroid; these are location-record measurements, not travel-time estimates: Location record

Nearby place / facilityRecorded distance
Financial District (Nanakramguda)1.2 km
IndusInd Bank0.4 km
Unnamed bus station2.2 km
Manuu Polytechnic Hyderabad1.6 km
Sankaraya Eye Hospital1.6 km
ADP0.0 km
South India Shopping Mall2.6 km
Unnamed park1.2 km
Nanakramguda Government Primary School0.5 km

9. Developer & development status

The registered promoter is PCH OFFICE SPACES LLP, an LLP, with GSTIN 36AAXFP5984B1ZM. The supplied corporate record lists BASANI KIRAN KUMAR REDDY as authorized signatory and DUGGIMPUDI SHOWRI REDDY as partner. The registered office/contact address in the project record is DEVAKRUPA, KOKAPET-ORRGC VILLAGE, NARSINGI MUNCIPALITY-ORRGC MANDAL, Ranga Reddy, 500075. No official contact number, email address or website is supplied. Corporate record Parties record

The promoter’s Form-B declaration, dated 04.05.2022, states a completion undertaking of 25TH day of JUNE 2027 and makes declarations about project funds, audits and approvals. The RERA header separately records proposed completion 25/10/2027; the supplied evidence does not establish construction progress or completion. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM ‘C’ certificate for THE HARVEST, registration P02400004833, valid 01/08/2022–25/06/2027.
HMDA technical building approvalTechnical approval No. 031393/SKP/C1/U6/HMDA/05122019, dated 25/06/2021; extracted as a commercial-building approval with conditions and requirements.
Environmental-clearance amendmentSEIAA document SIA/TG/INFRA2/522345/2025, dated 28/05/2025, grants an amendment to the environmental clearance for THE HARVEST and records conditions.
Terms-of-Reference amendmentSEIAA document SIA/TG/INFRA2/495263/2024, dated 02/12/2024, concerns amendment to prior Terms of Reference and requires additional baseline study and preparation/submission of an EIA report.
Further Terms-of-Reference amendmentSEIAA document SIA/TG/INFRA2/579146/2026, dated 07/07/2026, records an amendment to Terms of Reference for a mixed-use office-and-hotel configuration.
Title and promoter declarations filed with RERAForm-B declaration, 04.05.2022, by authorized signatory BJ KIRAN KUMAR REDDY; the supplied record also includes an advocate title report and filed title-chain documents.
Occupancy / completion certificateNot identified in the supplied document set. The HMDA approval states that an occupancy certificate is compulsory before occupation.

The HMDA layout lookup is reported unavailable through the public portal in the supplied evidence; this is an availability limitation, not evidence that approval was refused. No approved layout drawing, current construction certificate, or occupancy/completion certificate is supplied for this overview. HMDA

Due-diligence summary

Risk & red flags

1 medium
  • A regulatory proceeding before TG-RERA (a process, not a finding)
Full details: coming soon

Land & title

Nothing confirmed
  • Land record and title documents checked.
  • Nothing confirmed found in records checked.
Searched: Bhu Bharati land record, IGRS registration records, title documents
Full details: coming soon

Approvals

On file
  • HMDA plan approval 031393/SKP/C1/U6/HMDA/05122019 in the RERA filing.
Searched: RERA filing, HMDA/DTCP/GHMC approvals
Full details: coming soon

Legal

1 medium
  • Court and regulator records searched for this project.
  • A regulatory proceeding before TG-RERA (a process, not a finding)
Searched: eCourts, High Court, consumer forums, TG-RERA orders
Full details: coming soon

Contacts

  • Promoter: PCH OFFICE SPACES LLP (RERA filing).
  • Architect, engineer and other filed contacts in the full file.
Full details: coming soon

Frequently asked questions

Is THE HARVEST registered with Telangana RERA?

Yes. THE HARVEST is registered with the Telangana Real Estate Regulatory Authority as P02400004833; the registration status is New Project.

Who is the developer of THE HARVEST?

The promoter named in the RERA registration is PCH OFFICE SPACES LLP.

Where is THE HARVEST located?

THE HARVEST is in NARSINGI MUNCIPALITY-ORRGC MANDAL, Rangareddy, Telangana (500075).

When will THE HARVEST be completed?

The promoter's proposed date of completion filed with RERA is 25/10/2027. This is the promoter's declaration, not a guarantee.