thePropCheck AI property due diligence
Sign in

Emrald Greens

EMRALD GREENS is a residential apartment project in Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri. The registered promoter is SRINIVASA CONSTRUCTIONS. The project has a registered site extent of 8,004.37 sq. m., one apartment building with 1 Cellar + 1 Stilt + 8 Upper floors, and 124 3BHK units, each with a filed saleable area of 268.11 sq. m. Its TG-RERA registration is P02200003391, and its proposed completion is 18/10/2027.

At a glance

RERA registration
P02200003391, granted 24/09/2021; registration certificate states validity through 18/06/2027, unless extended by the Authority.
Promoter
SRINIVASA CONSTRUCTIONS, recorded as a partnership.
Site area
8,004.37 sq. m.
Building permit
Kompally Municipality Permit.No.0025/2021-22, dated 17.07.2021; file/proceedings Lr.No.0669/TP/KM/2021.
Saleable area
3BHK; 268.11 sq. m. saleable area per unit in the TG-RERA filing.
Construction stage
No independently verified site-progress report or construction-stage measurement is supplied. The RERA record is a “New Project”
Occupancy certificate
No occupancy or completion certificate is present in the supplied project records. The approval documents require an occupancy certificate before occupation.

The full project file

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

Emrald Greens is a residential apartment project recorded as a new project in its TG-RERA filing. The filing lists 124 units in one tower, with eight floors on 8,004.37 sq m of land and proposed completion on 18/10/2027.

Project type
Residential (apartment)RERA filing
Units
124RERA filing
Towers
1RERA filing
Floors
8RERA filing
Land area
8004.37 sq mRERA filing
Possession
18/10/2027RERA filing
Status
New ProjectRERA filing

Configurations & sizes

The project is filed with a 3BHK configuration; carpet area was not measured from the available floor-plan drawings. The TG-RERA filing records 124 units, 0 booked, and a saleable area of 268.11 sq m.

TypeSaleableSource
3BHK268.11 sq mRERA filing

Amenities

The filed amenities include recreational open space and community buildings, alongside listed site infrastructure.

3 amenities
  • Green Strip/TOT LOT/Park
  • Community Buildings
  • Aggregate area of recreational Open Space

Location & connectivity

The project is at Kompally Village, PIN 500014, in Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district.

Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri
📍 Open in Maps

Promoter

The promoter is Srinivasa Constructions, recorded as a partnership, with 3 other registered projects. Its official website is not disclosed; the filing names T. Kalyan Chakravarthy as architect and V. Nagesh Kumar as structural engineer.

SRINIVASA CONSTRUCTIONS
3 other projects on record

Sources & web results

Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
EMRALD GREENS
Developer / Promoter
SRINIVASA CONSTRUCTIONS
Project type
Residential
RERA Registration No.
P02200003391
Registration Status
New Project
Approved on
18/06/2021
Proposed completion
18/10/2027
Approving authority
HMDA
Plan approval no.
039576/MED/R1/U6/HMD
Total site area
8,004 sq m (2.0 acres)
Approved built-up area
27,850 sq m (6.9 acres)
Buildings (approved plan)
1
Locality
KOMPALLY VILLAGE, Kompally -Shivalayam
Mandal
Dundigal Gandimaisamma
District
Medchal-Malkajgiri
PIN code
500014
Documents on File
24

Frequently asked questions

Is EMRALD GREENS registered with Telangana RERA?

Yes. EMRALD GREENS is registered with the Telangana Real Estate Regulatory Authority as P02200003391; the registration status is New Project.

Who is the developer of EMRALD GREENS?

The promoter named in the RERA registration is SRINIVASA CONSTRUCTIONS.

Where is EMRALD GREENS located?

EMRALD GREENS is in KOMPALLY VILLAGE, Kompally -Shivalayam, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500014).

When will EMRALD GREENS be completed?

The promoter's proposed date of completion filed with RERA is 18/10/2027. This is the promoter's declaration, not a guarantee.

More projects in Kompally Shivalayam