The Imperia Residences - By Shri Salasar Developers is a residential apartment project in Narsingii Muncipality-ORRGC, Narsingii Muncipality-ORRGC Mandal, Ranga Reddy. It is being developed by registered promoter Shri Salasar Abode Infra Developers Private Limited on 2,405.88 sq. m of land, with 1 building comprising 1 Cellar + 1 Ground + 5 Upper floors and 57 apartments: 29 2BHK and 28 3BHK. The TG-RERA registration number is P02400005228, and its proposed completion date is 30/12/2025.

Project at a glance

Project identity

ItemProject record
Registered project nameThe Imperia Residences - By Shri Salasar Developers RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name or phase-wise registration scope is disclosed. The approval describes one proposed residential building. RERA record
TG-RERA registrationP02400005228 RERA record
Registration validity28/10/2022 to 31/12/2024; the certificate records a two-year validity period and says extension would be subject to Authority action. The supplied record says no extension. Approvals record
Registered promoterShri Salasar Abode Infra Developers Private Limited RERA record Corporate record
RERA statusThe supplied registration record shows the above validity dates; a current registration status beyond 31/12/2024 is not established by the supplied evidence. Approvals record

Land and geographic identity

ItemProject record
LocalityNarsingii Muncipality-ORRGC, Ranga Reddy RERA record RERA filing
Revenue villageRERA filing: Narsingii Muncipality-orrgc; approval and title documents: Manchirevula-ORRGC Village / Manchirevula village. RERA filing
MandalNarsingii Muncipality-ORRGC Mandal is stated in the HMDA technical approval; the RERA land details do not disclose a mandal. Land records
DistrictRanga Reddy RERA record RERA filing
PIN500074 in the project filing; the registration certificate also records a promoter-office PIN of 500034. RERA record RERA filing
Project survey numbersSy No 257 and 258; the registration certificate specifies Sy No 257 and 258. No subdivision is supplied. RERA record Land records
Registered site extent2,405.88 sq. m in the project land record and HMDA approval. Land records
Total / net land areaTotal area: 2405.88 sq. m; net area: 2405.88 sq. m; area reported affected by road widening/FTL/nala widening: 0 sq. m. RERA filing Land records
Boundaries in RERA filingNorth: Road width 15 point 24; South: CTC NO; East: CTC NO; West: Sy No 257 and 258. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval identifies Narsingi municipality as the delegated executive authority for further building-plan sanction and release. Approvals record
Principal approvalTechnical Approval No. 044357/ZOA/R1/U6/HMDA/20032021, approved 08/02/2022. RERA record Approvals record
Approved built-up areaHMDA approval records Built up Area 6350.83 and Total Built up 6372.3 Sq.mts. These are figures stated in the approval; the evidence does not identify them as carpet or saleable area.
Building / block countRERA filing records 1 total building unit; HMDA approval describes one proposed residential building. RERA filing
Sanctioned floor configuration1 Cellar + 1 Ground + 5 Upper floors, as stated in the technical approval.
Parking levelsApproval says the cellar/silt is to be used exclusively for vehicle parking; a parking count is not supplied.
Unit countsRERA filing: 57 total units—29 2BHK and 28 3BHK. RERA unit table RERA unit table

Offering and status

ItemProject record
Unit types and RERA-filed saleable area2BHK: 45.26 sq. m; 3BHK: 144.32 sq. m. RERA unit table RERA unit table
Booked / availableRERA portal reading: 5 booked and 52 available—2BHK: 2 booked / 27 available; 3BHK: 3 booked / 25 available. Counts are indicative: the portal record has no as-of date. RERA unit table RERA unit table
Construction stageA project-level construction stage is not supplied. The filed amenity progress entries show 0% where reported; these are not independent site-verification findings. RERA amenities
Completion datesForm B declaration dated 02 May 2022 undertakes completion by 31/12/2024; a later Form B dated 25 April 2025 states 30/12/2025. The RERA header lists proposed completion as 30/12/2025. RERA record
Occupancy / completion certificateThe supplied HMDA approval extraction states completion is not certified; no occupancy or completion certificate is included in the supplied records. This does not establish the current certificate status. Document index

The project story

The RERA-filed project is a residential apartment development on Sy No 257 and 258, associated in the filing with Narsingii Muncipality-ORRGC, Ranga Reddy, and in the approval and title documents with Manchirevula village. The registered land extent is 2,405.88 sq. m. RERA record Land records

The project is recorded as one building with 57 apartments: 29 2BHK and 28 3BHK. HMDA’s technical approval describes a proposed residential building with 1 Cellar + 1 Ground + 5 Upper floors. The supplied records do not establish the current on-site construction stage or independently verify completion of any portion. RERA unit table

The RERA filing’s proposed completion date is 30/12/2025. The registration certificate records validity through 31/12/2024; those are separate project and registration dates. No occupancy or completion certificate is supplied. RERA record Approvals record

Master plan, architecture & building design

The recorded site area is 2,405.88 sq. m. The HMDA technical approval identifies one proposed residential building and records a built-up area of 6350.83 and total built-up area of 6372.3 Sq.mts. The supplied records do not state an FSI-counted area, building footprint, or separate gross, carpet, or saleable built-up breakdown. Land records

The approval describes 1 Cellar + 1 Ground + 5 Upper floors and a building height of 17.94. It specifies one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. The approved-plan extraction does not provide a per-floor apartment schedule, lift or stair count, landscape area, internal road plan, or residential/common-area distribution.

The RERA filing records one building unit and 57 proposed units. No separate phase-wise building or unit breakdown is supplied. RERA filing RERA unit table

Homes, configurations & floor plans

RERA records 57 units across two configurations. The 3BHK carpet-area figures below are software-measured from the filed floor-plan drawing, not RERA-filed measurements; the source notes that drawing geometry requires review. The RERA saleable-area figures are presented separately and should not be treated as carpet area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2922745.26 sq. mNot measured in supplied drawingsNot supplied
3BHK28325144.32 sq. m87.2–113.9 sq. m; median 103.2 sq. m (8 flat designs measured)28%

The measured 3BHK drawing includes a master bedroom, two other bedrooms, kitchen, dining, drawing/living room, puja and toilets. The drawing labels a 1.80m wide utility and a 2.00m wide balcony; these are excluded from the software-measured carpet area. RERA unit details

Carpet area is the drawing-measured internal area described by the supplied measurement record; saleable area is the RERA-filed figure and includes the home’s share of common areas according to the supplied drawing-measurement caveat. The filing does not provide a carpet-area figure for the 2BHK configuration. Floor plans RERA unit details RERA unit table

Parking & vehicle circulation

The HMDA approval directs that the cellar/silt be used exclusively for vehicle parking and not be partitioned or converted. It also records one entry and one exit, with minimum width of 4.5mts. and height clearance of 5mts.

The approval and supplied RERA unit record do not establish the number of parking spaces, visitor or accessible spaces, parking allocation to individual apartments, two-wheeler provision, mechanical parking, EV charging, or pedestrian separation. A parking bay or space allocation cannot be established from the supplied evidence. RERA unit table

Amenities, recreation & open spaces

The RERA amenities record lists the following items. Its progress fields show 0% where supplied; the record does not independently verify whether any facility has since been built or is operational. The HMDA approval separately mentions certain site provisions. RERA amenities

Community buildings
Description / sizeNo size or capacity supplied
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusListed as available “YES”; 0% progress; not independently verified
Tot-lot / green strip / park
Description / sizeNo size supplied
Evidence sourceRERA amenities record RERA amenities; HMDA approval
Declared progress / verified status0% progress; not independently verified
Water conservation / rainwater harvesting
Description / sizeRainwater-harvesting structures required by HMDA approval
Evidence sourceRERA amenities record RERA amenities; HMDA approval
Declared progress / verified statusRERA-listed “YES”; 0% progress; not independently verified

No clubhouse or indoor recreation specification, sports facility, or measured open-space area is supplied. RERA amenities

Utilities, building services & safety

The RERA amenities record lists water supply; sewerage (chambers, lines, septic tank, STP); storm-water drains; sewage and sullage treatment and disposal; solid-waste management; energy management; fire protection and safety; and an electrical meter room, sub-station or receiving station. These entries do not provide capacities or establish completion. RERA amenities

HMDA’s technical approval specifies separate underground static water storage and terrace-tank capacity of 25,000 Its. each for residential buildings, and calls for rainwater-harvesting structures, a transformer, a garbage house, water supply, and drainage and sewerage disposal. It also specifies a safe distance of at least 3.0mts. vertically and horizontally from high-tension electrical lines and 1.5mts. for low-tension lines.

The approval requires the building to be occupied only after completion in accordance with the technically approved plans and issuance of a “Fit for Occupancy” certificate by the executive authority; it also states that an occupancy certificate is compulsory before occupation. The supplied evidence does not establish that such a certificate has been issued. No lift details, backup-power capacity, CCTV, access-control system, waste-segregation arrangements, or accessibility provisions are supplied.

Location, access & connectivity

The project’s RERA-filed locality is Narsingii Muncipality-ORRGC, Ranga Reddy. The project approval and title documents identify the land as being in Manchirevula-ORRGC Village / Manchirevula village, with the approval specifying Narsingii Muncipality-ORRGC Mandal. RERA record Land records

The RERA filing gives the northern boundary as “Road width 15 point 24”; the HMDA approval refers to an 18 mt. road and an existing 40.00 feet road from the main road to the site, through which access to neighbours is to be provided. The supplied location record lists the Financial District (Nanakramguda) at 1.2 km. No travel time or public-transport detail is supplied. RERA filing Location record

Developer & development status

The registered legal promoter is Shri Salasar Abode Infra Developers Private Limited, a company. Its supplied corporate identifier is GSTIN 36ABBCS1610F1ZU. The project filing gives the promoter’s address as Vedanika Place, Road No 12, Manchirevula-ORRGC, Narsingii Muncipality-ORRGC, Ranga Reddy, PIN 500074. RERA record Corporate record Parties record

The RERA filing lists Abhishek Tibrewala as authorized signatory and director, alongside directors Manish Tiberewala, Neha Gupta, and Sunil Kumar Chokhani. The RERA land record names Satish Kumar Agarwal and Manoj Gupta as landowners under revenue-share agreements. Parties record Land records

The promoter’s Form B dated 25 April 2025 declares completion by 30/12/2025; the project header also records that proposed completion date. The supplied evidence does not establish a current construction percentage or independent site progress assessment. RERA record

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for P02400005228, issued 28/10/2022, valid through 31/12/2024; no extension is recorded in the supplied certificate extraction.
Principal technical approvalHMDA Technical Approval No. 044357/ZOA/R1/U6/HMDA/20032021, dated 08/02/2022, for the proposed residential building on Sy Nos. 257 and 258.
Building / layout plansThe RERA filing lists plan approval under the above HMDA number. The supplied layout-plan document entry (234963) is not extracted as a full plan in the evidence provided; drawing measurements are available for 3BHK units. Approvals record Document index
Commencement / occupancy / completionThe supplied HMDA technical-approval document is titled “Commencement Certificates for each building in each phase” and describes technical approval and conditions for subsequent sanction and occupancy. Its extraction states that completion is not certified. No separate occupancy/completion certificate is supplied. Document index
Promoter declarationsForm B declarations dated 02 May 2022 and 25 April 2025.
Title documents and title opinionTitle-report materials include the title opinion (doc 265627), the development agreement-cum-irrevocable GPA (doc 265628), and the title report (doc 265629).
Encumbrance statementFiled EC statement doc 267599 covers 10-05-2022 to 20-09-2022; it is a record for that stated search period.

The supplied records do not include a current occupancy certificate, a current registration-status extract, or a publicly available approved-layout lookup result. Document index Approvals record HMDA

Due-diligence summary

Risk & red flags

1 high
  • Completion date has passed and the project is not complete
Full details: coming soon

Land & title

Nothing confirmed
  • Land record and title documents checked.
  • Nothing confirmed found in records checked.
Searched: Bhu Bharati land record, IGRS registration records, title documents
Full details: coming soon

Approvals

On file
  • HMDA plan approval 044357/ZOA/R1/U6/HMDA/20032021 in the RERA filing.
Searched: RERA filing, HMDA/DTCP/GHMC approvals
Full details: coming soon

Legal

Searched
  • Court and regulator records searched for this project.
  • No TG-RERA proceedings found.
Searched: eCourts, High Court, consumer forums, TG-RERA orders
Full details: coming soon

Contacts

  • Promoter: Shri Salasar Abode Infra Developers Private Limited (RERA filing).
  • Architect, engineer and other filed contacts in the full file.
Full details: coming soon

More projects in Rangareddy

Frequently asked questions

Is The Imperia Residences - By Shri Salasar Developers registered with Telangana RERA?

Yes. The Imperia Residences - By Shri Salasar Developers is registered with the Telangana Real Estate Regulatory Authority as P02400005228; the registration status is New Project.

Who is the developer of The Imperia Residences - By Shri Salasar Developers?

The promoter named in the RERA registration is Shri Salasar Abode Infra Developers Private Limited.

Where is The Imperia Residences - By Shri Salasar Developers located?

The Imperia Residences - By Shri Salasar Developers is in Narsingii Muncipality-ORRGC, Ranga Reddy, Rangareddy, Telangana (500074).

When will The Imperia Residences - By Shri Salasar Developers be completed?

The promoter's proposed date of completion filed with RERA is 30/12/2025. This is the promoter's declaration, not a guarantee.