Bsr Enclave Phase II
BSR ENCLAVE PHASE II is a plotted development in SOMAGUDEM, Bellampally mandal, Mancherial district. The registered promoter is BAKAM SRINIVAS RAO. The RERA-filed land area is 7837.60 sq m, and the filed draft layout describes 20 (Twenty Plots); building or floor configuration and plot-size range are not disclosed. The TG-RERA registration is P01200009619, with a proposed completion date of 15/09/2025.
At a glance
- RERA registration
- P01200009619
- Registration valid
- 15/09/2023–15/09/2025; the supplied certificate says registration was for two years and does not record an extension.
- Promoter
- BAKAM SRINIVAS RAO on the certificate; the project identity record gives BAKAM.
- Site area
- Total area and net area each recorded as 7837.60 sqmts; affected area recorded as 0.00 sqmts.
- Building permit
- District Town & Country Planning Officer, Mancherial; Draft TLP No. 12/2023/DTCPO/MNCL, approved date recorded as 15-09-2023.
- Booked / available
- Not disclosed in the supplied evidence.
- Construction stage
- The project identity record gives completeness as 80%; the basis, reporting date and independent site-verification status are not supplied.
The full project file
Description
BSR Enclave Phase II is a plotted development with 20 plots on 7,837.60 sq m of land. TG-RERA records the project as ongoing, with a proposed completion date of 15 September 2025.
- Project type
- Plotted DevelopmentRERA filing
- Units
- 20proptiger
- Land area
- 7837.60 sq mRERA filing
- Possession
- 15/09/2025RERA filing
- Status
- On-Going ProjectRERA filing
Configurations & sizes
The developer advertises plots with saleable areas of 2,376–5,472 sq ft; the RERA filing’s plot-level units, bookings and saleable areas are not disclosed in the supplied record. Carpet areas measured from approved drawings are not available because the drawings are pending review.
| Type | Built-up | Saleable | Source |
|---|---|---|---|
| Plot | 2,376 - 5,472 sq ft | proptiger | |
| Plotted Development | 5805.87 | aurumproptech |
Amenities
The project’s disclosed amenities and infrastructure include recreational open space and basic services.
- Green Strip/TOT LOT/Park
- Aggregate area of recreational Open Space
- Parking
- recreational open space
Specifications
- Utilities
- Water Supply, Sewerage, Street Lighting, Electrical Meter Room
Location & connectivity
The project is in Somagudem, Akenpally village, Bellampally mandal, Mancherial district. It borders a railway line to the east and a national highway to the west.
Promoter
The promoter is BAKAM, an individual promoter. The supplied record identifies three other registered projects and names ASLAM as architect and SIDDI MAHESH as structural engineer.
Additional details
Sources & web results
- BSR Enclave Phase II in Somagudem, Adilabadproptiger.com
- RERA No. P01200009619 - bsr enclave phase iiaurumproptech.in
- Bakam Srinivas Rao BSR Enclave Phase II in Somagudem ...housing.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- BSR ENCLAVE PHASE II
- Developer / Promoter
- BAKAM
- Project type
- Plotted Development
- RERA Registration No.
- P01200009619
- Registration Status
- On-Going Project
- Approved on
- 15/09/2023
- Proposed completion
- 15/09/2025
- Approving authority
- DTCP
- Plan approval no.
- 12/2023/DTCPO/MNCL
- Total site area
- 7,838 sq m (1.9 acres)
- Approved built-up area
- 5,806 sq m (1.4 acres)
- Locality
- SOMAGUDEM, Akenpally
- Mandal
- Bellampally
- District
- Mancherial
- PIN code
- 504251
- Documents on File
- 11
Other registrations of Bsr Enclave
Frequently asked questions
Is BSR ENCLAVE PHASE II registered with Telangana RERA?
Yes. BSR ENCLAVE PHASE II is registered with the Telangana Real Estate Regulatory Authority as P01200009619; the registration status is On-Going Project.
Who is the developer of BSR ENCLAVE PHASE II?
The promoter named in the RERA registration is BAKAM.
Where is BSR ENCLAVE PHASE II located?
BSR ENCLAVE PHASE II is in SOMAGUDEM, Akenpally, Bellampally, Mancherial, Telangana (504251).
When will BSR ENCLAVE PHASE II be completed?
The promoter's proposed date of completion filed with RERA is 15/09/2025. This is the promoter's declaration, not a guarantee.