BRICKHAUS THE BASIL BLOCK - B is a residential apartment project in Rolling Meadows layout, Madina Guda, Serilingampally Mandal, Ranga Reddy District. The registered promoter is GADDE INFRA PROJECTS PRIVATE LIMITED. The project covers 468.10 sq.m and comprises one building with 1 Stilt + 5 Floors and 10 3BHK homes, each with a RERA-filed saleable area of 167.69 sq.m. Its TG-RERA registration is P02400010995, and the proposed completion date is 10/03/2029.

More from Gadde Infra Projects Pvt Ltd · 2 projects →

At a glance

RERA registration
P02400010995; valid from 10/11/2025 to 10/11/2028. Registration validity is separate from the completion deadline and does not establish completion or occupancy certification.
Promoter
GADDE INFRA PROJECTS PRIVATE LIMITED.
Site area
RERA land details state total and net area of 468.10 sq.m. The Form B declaration states 560.00 Sq. yards or 468.16 Sq. mts
Building permit
Greater Hyderabad Municipal Corporation (GHMC); delegated to Serilingampally Zone.
Saleable area
167.69 sq.m per 3BHK unit.
Construction stage
The project is recorded as On-Going Project; the supplied records do not provide independently verified physical construction progress.
Occupancy certificate
No completion or occupancy certificate is recorded in the supplied project documents

The full project file

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

This is an ongoing residential apartment project registered with TG-RERA, with completion proposed for 10 March 2029. The filing describes a 10-home, single-block project on 468.10 sq m of land, with five floors.

Project type
Residential (apartment)RERA filing
Units
10RERA filing
Towers
1RERA filing
Floors
5RERA filing
Land area
468.10 sq mRERA filing
Possession
10/03/2029RERA filing
Status
On-Going ProjectRERA filing

Configurations & sizes

The approved drawings measure the 3BHK carpet area at 85.0–85.1 sq m; this is a drawing-based measurement, not a RERA disclosure, and should be verified against the drawings. The TG-RERA filing records 10 such homes, zero booked, and saleable area of 167.69 sq m each.

TypeCarpetSaleableFacingSource
3BHK167.69 Sq.mt.167.69 sq mRERA filing
East-facing · 3 BHK1,805 sq ftEast-facingDeveloper site
West-facing · 3 BHK1,805 sq ftWest-facingDeveloper site

Amenities

Disclosed amenities include a central green, play and yoga areas, indoor games, security and CCTV, backup power, and water and wastewater infrastructure.

27 amenities
  • Green Strip/TOT LOT/Park
  • Kids' Play Areas / Sand Pits
  • Yoga Areas
  • Power Backup
  • 24 x 7 Security
  • CCTV / Video Surveillance
  • Normal Park / Central Green
  • Indoor Games
  • shared landscaped green
  • covered parking
  • EV charging provision in all parking spaces
  • bore-well water from the overhead tank
  • dedicated Manjeera drinking-water point in each kitchen from the overhead tank
  • JOHNSON lift with 8-passenger capacity
  • KIRLOSKAR make generator
  • Cycling & Jogging Track
  • Lift
  • Park
  • Water Storage
  • Vaastu Compliant
  • Garden View
  • Waste Disposal
  • CCTV Camera
  • Fire Sprinklers
  • Kids play area
  • Water treatment plant
  • Fire Fighting Equipment

Specifications

Community
Gated, 24/7 — two residential blocks, twenty homes, shared landscaped green and covered parking.
Electrical
Concealed copper wiring with adequate points in all rooms. Modular switch boards with LEGRAND switches & accessories and POLYCAB wiring.
EV Charging
Provision for Electric Vehicle chargers in all parking spaces.
finish
Oil Bound Distemper
flooring
Vitrified Tiles
Flooring
QUTONE make vitrified tiles, sized 2'×4' / 2'×2'.
Foundation & Structure
RCC framed structure with seismic-resistant design.
Generator
KIRLOSKAR make generator. Backup for lift, bore-well, common lighting and one fan and one light in each room.
Joinery
Frames: ENCORE-make imported best MT-quality teakwood with PU polish. Main door 8'×4', internal doors 7'×3'. Shutters: AM Walnut & Sapeli veneer finish, PU polish — 40 mm main, 35 mm internal. Hardware: DORSET; main door with digital lock.
structure
RCC Frame Structure
Super Structure
Internal: Double-coat cement plastering with wall putty. External: Texture finish on all sides. Red clay brick work with cement mortar.
Toilets
SIMPOLO premium sanitary fixtures throughout. Anti-skid ceramic tile flooring, 7' ceramic wall cladding. False ceilings included as standard in all bathrooms.
Water Supply
Bore-well water from the overhead tank; dedicated Manjeera drinking-water point in each kitchen from the overhead tank.
Windows
High-end window and door systems using VEKA (German-engineered) uPVC profiles. Sliding toughened glass doors with safety iron grills and mosquito nets.

Location & connectivity

The RERA filing places the project in Madina Guda, Serilingampally mandal, Ranga Reddy district. The developer advertises HITEC City as 12 minutes away and names Oakridge, Chirec and Delhi Public among nearby schools.

Madina Guda, Serilingampally, Ranga Reddy
📍 Open in Maps

Promoter

The promoter is GADDE INFRA PROJECTS PRIVATE LIMITED, a private limited company with one other registered project. Its official website is https://www.brickhaus.in; the named architect is MALLISETTY SREEDHAR and the structural engineer is THOTA CHAKRAPANI.

GADDE INFRA PROJECTS PRIVATE LIMITED
1 other project on record
Official website ›Developer site

Additional details

Launched 01 October 2025magicbricks

Filed vs marketed

The filing records 10 homes, one tower and proposed completion on 10/03/2029, while the developer markets 20 homes, and Magicbricks lists two towers and possession on 01 October 2028; the developer site also gives a more specific Kondapur address than the filing’s locality entry.

  • Total units: The developer’s site says Total 20 homes; the RERA filing says 10. Developer site
  • Towers: magicbricks says 2; the RERA filing says 1. magicbricks
  • Possession: magicbricks says 01 October 2028; the RERA filing says 10/03/2029. magicbricks
  • Locality: The developer’s site says Plot No. 18, 19 & 22, 23 Rolling Meadows, Narne Estates Road Kondapur, Hyderabad — 500 084; the RERA filing says UNDER GREATER HYDERABAD MUNICIPAL CORPORATION. Developer site
The RERA filing is the legally binding record.

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
BRICKHAUS THE BASIL BLOCK - B
Developer / Promoter
GADDE INFRA PROJECTS PRIVATE LIMITED
Project type
Residential
RERA Registration No.
P02400010995
Registration Status
On-Going Project
Approved on
10/11/2025
Proposed completion
10/03/2029
Approving authority
GHMC
Plan approval no.
1745/GHMC/SWBP/SLP2/2025
Total site area
468 sq m (0.1 acres)
Approved built-up area
1,317 sq m (0.3 acres)
Buildings (approved plan)
1
Locality
UNDER GREATER HYDERABAD MUNICIPAL CORPORATION, Madina Guda
Mandal
Serilingampally
District
Rangareddy
PIN code
500084
Documents on File
31

Other registrations of Brickhaus The Basil

Frequently asked questions

Is BRICKHAUS THE BASIL BLOCK - B registered with Telangana RERA?

Yes. BRICKHAUS THE BASIL BLOCK - B is registered with the Telangana Real Estate Regulatory Authority as P02400010995; the registration status is On-Going Project.

Who is the developer of BRICKHAUS THE BASIL BLOCK - B?

The promoter named in the RERA registration is GADDE INFRA PROJECTS PRIVATE LIMITED.

Where is BRICKHAUS THE BASIL BLOCK - B located?

BRICKHAUS THE BASIL BLOCK - B is in UNDER GREATER HYDERABAD MUNICIPAL CORPORATION, Madina Guda, Serilingampally, Rangareddy, Telangana (500084).

When will BRICKHAUS THE BASIL BLOCK - B be completed?

The promoter's proposed date of completion filed with RERA is 10/03/2029. This is the promoter's declaration, not a guarantee.

More projects in Madina Guda