Risk & red flags
- Completion date has passed and the project is not complete
INSPIRES PROJECT · Rangareddy · RERA P02400002876
INSPIRESPROJECT is a residential apartment project in Serlingampally, Ranga Reddy district; the mandal is not disclosed in the project identity fields. The registered promoter is Inspires Project, identified as a partnership. The project has a site area of 501.6 m² and one building, Building - A (INSPIRE 3), sanctioned as 1 Stilt + 5 upper floors, with 9 3BHK apartments. Its TG-RERA registration number is P02400002876, and the Form B declaration undertakes completion by 02Feb, 2024.
Project identity
| Field | Project record |
|---|---|
| Registered project name | INSPIRESPROJECT RERA record |
| Project type / use | Residential apartment project RERA filing |
| Phase / registered portion | The supplied records identify one registered project; no separate phase name is disclosed. The building permit identifies Building A (INSPIRE 3). RERA record |
| TG-RERA registration | P02400002876 RERA record |
| Registration validity | 30/04/2021 to 20/03/2025, as stated on the Form C certificate; the certificate records no extension. Registration validity is distinct from the completion undertaking and from occupancy certification. Approvals record |
| Registered promoter | Inspires Project; the RERA filing identifies the organization as a partnership. RERA filing Parties record |
| RERA status in supplied record | Certificate records registration through 20/03/2025; a current extension or renewed status is not disclosed in the supplied certificate. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / neighborhood | Serlingampally; the building permit identifies the site locality as Kondapur. RERA record |
| Revenue village | Serlingampally is the village stated in the RERA project identity; title and permit documents refer to Kondapur Village. RERA record Land records |
| Mandal | Not disclosed in the project identity fields. RERA filing |
| District | Ranga Reddy in the RERA project identity. RERA record |
| PIN | 500084 RERA record |
| Survey numbers | 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92 and 93; records also express this as “78 to 93” or “78 TO 93.” No subdivision is identified in the supplied project identity. Land records |
| Plots / site identity | Plot Nos. 1001 and 1002 RERA filing |
| Registered site extent / total and net area | 501.6 m²; total area 501.6 m², net area 501.60 m², affected area recorded as 0 m². RERA filing |
| Boundaries | East: ROAD WIDTH 9; West: PLOT NO 1015 AND 1016; North: PLOT NO 1000; South: PLOT NO 1003. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2/C20/04719/2019, dated 20 March, 2019; file no. 2/C20/24448/2018. Approvals record |
| Approved built-up area | 1,445.16 m² in the RERA project fields. The permit extraction separately lists residential upper-floors area 1,204.30 m² and stilt area 227.54 m². RERA filing |
| Building count / identified building | One building unit is recorded; the permit identifies Building - A (INSPIRE 3). RERA filing |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors; permit-extracted height 15 m. |
| Parking levels / provision | Stilt is approved for parking in the building permit; the permit states that approved stilt parking is to be used exclusively for vehicles. A parking-space count is not disclosed in the supplied records. |
| Units | 9 units in the RERA unit record; the approved-plan field records 1 building unit, not a flat count. RERA unit table RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Unit type | 3BHK apartments RERA unit table |
| RERA-filed saleable area | 143.63 m² per unit RERA unit table |
| Booked / available | 0 booked / 9 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | No independently verified site-stage evidence is supplied. RERA amenity records show varying declared percentages; these are not independent site verification. RERA amenities |
| Completion dates | TG-RERA certificate validity ends 20/03/2025. The Form B declaration separately undertakes completion by 02Feb, 2024. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records. The building permit requires an occupancy certificate before occupation. |
The supplied TG-RERA record describes a residential apartment project on Plot Nos. 1001 and 1002, associated with Survey Nos. 78–93 and the Serlingampally/Kondapur location identifiers in the project and filed documents. It comprises one identified residential building, Building A (INSPIRE 3), sanctioned as 1 stilt + 5 upper floors. RERA record RERA filing
The RERA unit record lists nine 3BHK apartments, all shown as available in the portal-derived snapshot, with no as-of date recorded. The filing reports 143.63 m² saleable area per unit. Drawing-based software measurement is a separate, non-RERA measurement; it is described below. RERA unit table RERA unit details
The supplied material does not establish the project’s present construction stage through an independent site inspection or a current completion certificate. Amenity progress percentages are portal-recorded declarations, not independent verification. The Form B affidavit gives a completion undertaking of 02Feb, 2024, while the registration certificate states validity through 20/03/2025; these are separate recorded dates. RERA amenities
The RERA land record gives a total and net site area of 501.6 m², with 0 m² affected area. The GHMC permit extraction identifies a residential building, Building A (INSPIRE 3), on a 501.6 m² site, with 1 stilt + 5 upper floors and a stated height of 15 m. RERA filing
The RERA fields list approved built-up area as 1,445.16 m². The permit extraction separately reports 1,204.30 m² residential upper-floors area and 227.54 m² stilt area; these figures are kept in their recorded categories and are not treated as interchangeable. RERA filing
The permit extraction records a 3.5 m setback and a compound wall length of 172.51 RM. It also lists 1 No. of RWHPs, 25 Trees, space for a transformer and a garbage house. The supplied records do not establish a detailed floor-by-floor arrangement, flats per floor, lift or stair configuration, entrances, internal circulation, landscape plan, or residential/common-area breakdown.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 9 | 0 | 9 | 143.63 m² | 82.3–90.8 m²; median 86.9 m² (software-measured) | 39% (software-derived drawing record) |
RERA records nine 3BHK units and a saleable area of 143.63 m². The booked and available counts are portal-derived and have no recorded as-of date. RERA unit table RERA unit details
The carpet-area range and median are measured by software from the approved floor-plan drawing geometry, not filed as RERA carpet-area disclosures; the drawing measurement is marked as needing review. The measurement set covers four flat designs. Carpet area, balconies and the home’s share of common areas are not the same measure: the drawing record identifies balconies as excluded from carpet area and explains that saleable area includes a share of common areas. Verify drawing measurements against the plan. RERA unit details Floor plans
The extracted first-floor plan room record for flat 01 lists bedrooms, living/dining, kitchen, toilets and balconies. The supplied record does not provide a complete, reliable room schedule for every unit. RERA unit details
The GHMC permit states that the stilt is approved for parking and that approved stilt parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The RERA project fields record a mortgage area of 126.83 m², but the supplied material does not specify parking-space numbers or unit-by-unit parking allocations. RERA filing
No separate resident, visitor, accessible or two-wheeler parking counts, parking layout, ramp arrangement, vehicle-entry/exit plan, pedestrian separation or EV-charging provision are established in the supplied records. A drawn parking bay, if present in the plan, would not by itself establish an exclusive allotment to a particular apartment. RERA unit table
The following progress percentages and availability entries are from the TG-RERA amenity record. They are declarations in that record and are not independent verification of delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip / TOT LOT / Park | Size not supplied | TG-RERA amenity record; permit extraction lists 25 Trees RERA amenities | 100% declared; independently verified status not supplied |
| Water Conservation / Rain Water Harvesting | Permit extraction lists 1 No. of RWHPs and requires a rainwater-harvesting structure (percolation pit) RERA amenities | 60% declared in RERA record; independently verified status not supplied | |
| Water Supply | Size, source and capacity not supplied RERA amenities | TG-RERA amenity record | “YES”; 50% declared; independently verified status not supplied |
| Sewerage (chamber, lines, septic tank, STP) | System details and capacities not supplied RERA amenities | TG-RERA amenity record | “YES”; 50% declared; independently verified status not supplied |
| Storm Water Drains | Details and capacity not supplied RERA amenities | TG-RERA amenity record | “YES”; 50% declared; independently verified status not supplied |
| Electrical meter room / sub-station / receiving station | Permit extraction requires space for a transformer RERA amenities | TG-RERA amenity record and permit extraction | “YES”; 50% declared; independently verified status not supplied |
| Internal Roads & Footpaths | Details and dimensions not supplied RERA amenities | TG-RERA amenity record | 0% declared |
| Street Lighting | Details not supplied RERA amenities | TG-RERA amenity record | 0% declared |
| Community Buildings | Details not supplied RERA amenities | TG-RERA amenity record | 0% declared |
| Sewage and sullage treatment/disposal | Details not supplied RERA amenities | TG-RERA amenity record | 0% declared |
| Solid Waste Management and Disposal | Details not supplied RERA amenities | TG-RERA amenity record | 0% declared |
| Energy management | Details not supplied RERA amenities | TG-RERA amenity record | 0% declared |
| Fire Protection and Fire Safety Requirements | Details not supplied RERA amenities | TG-RERA amenity record | 0% declared |
| Aggregate recreational open space | Area not supplied RERA amenities | TG-RERA amenity record | 0% declared |
The permit also requires a garbage house within the premises, tree planting along the periphery and in front of the premises, and a transformer space. These are permit conditions; the supplied records do not independently confirm completion.
The RERA amenity record marks water supply, sewerage, storm-water drains and electrical meter room/sub-station/receiving-station provision as “YES,” each at 50% declared progress. It records water conservation/rainwater harvesting at 60%. These entries do not identify capacities, sources, treatment processes or independent completion verification. RERA amenities
The permit requires an ETP as per standard specification; see Amenities, recreation & open spaces above for the permit requirements concerning a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. The supplied material does not specify ETP capacity, water storage or source, STP design, treated-water reuse, storm-water-harvesting capacity, electrical backup, lift provision or lift capacity.
The permit extraction states that an occupancy certificate is compulsory before occupation and requires a completion notice after building completion. It also lists fire protection and fire-safety requirements at 0% declared in the RERA amenity record. No fire-system details, fire clearance, escape-stair details, accessibility provision, CCTV, security arrangements or waste-segregation system are established by the supplied records. RERA amenities
The project identity records Serlingampally, Ranga Reddy district, PIN 500084; the building permit identifies the site locality as Kondapur. The project land record gives the east boundary as ROAD WIDTH 9 and identifies plots on the north, south and west boundaries. RERA record RERA filing
The supplied location record gives the Financial District (Nanakramguda) as an anchor 1.2 km away. The provided data does not establish public-transport options, approach-road names, measured distances to other landmarks, or travel times. Location record
The TG-RERA project fields identify INSPIRES PROJECT as a partnership promoter; the registration certificate names Inspires Project. The project record does not supply a company registration number, promoter contact details, official website, or verified registered-office address. RERA filing Parties record
The building permit names M/S INSPIRES PROJECT, represented by T. Veera Reddy, as applicant and MS ELITE PROJECTS as developer/builder. These are the roles stated in that permit.
In the Form B affidavit, T. Veera Reddy, on behalf of M/S INSPIRE PROJECTS, declares a completion undertaking of 02Feb, 2024 and makes other RERA-related declarations. The supplied records do not provide independent construction-progress verification or a current occupancy/completion certificate.
| Identifier / date | P02400002876; issued 30/04/2021; validity to 20/03/2025 |
|---|---|
| What the supplied record establishes | Registration certificate for INSPIRESPROJECT; no extension is recorded on this certificate. |
| Identifier / date | Approval 2/C20/04719/2019; file 2/C20/24448/2018; dated 20 March, 2019 |
|---|---|
| What the supplied record establishes | Building A (INSPIRE 3), residential, 1 Stilt + 5 upper floors, on a stated site extent of 501.6 m². The permit requires an occupancy certificate before occupation. |
| Identifier / date | 2/C20/04719/2019, drawing record |
|---|---|
| What the supplied record establishes | Drawing source used for software-measured floor-plan information; supplied plan text is marked as needing review. |
| Identifier / date | Declaration dated 25"day of Oct, 2020 |
|---|---|
| What the supplied record establishes | Promoter-side affidavit containing a completion undertaking of 02Feb, 2024 and other declarations. |
| Identifier / date | Dated 25TH FEBRUARY 2021 |
|---|---|
| What the supplied record establishes | Advocate’s report concerning Plot Nos. 1001 and 1002, stated as 600 SQ.YDS in Survey No. 78 to 93 at Raja Rajeswaranagar, Kondapur Village. |
| Identifier / date | Search period 01-10-2000 to 10-10-2020 |
|---|---|
| What the supplied record establishes | Filed statement records one mortgage without possession dated 12-03-2019. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate is established by the records reviewed for this Overview. |
Other approval-document identifiers in the building-permit extraction include 4719/2019, LRS31052016123352 and LRS/443/CR-II/WEST ZONE/GHMC/2012. The supplied data does not include a current occupancy certificate or a publicly accessible approved-layout lookup record. HMDA
Project identity
Registered project name: INSPIRESPROJECT
Project type / use: Residential apartment project
Phase / registered portion: The supplied records identify one registered project; no separate phase name is disclosed. The building permit identifies Building A (INSPIRE 3).
TG-RERA registration: P02400002876
Registration validity: 30/04/2021 to 20/03/2025, as stated on the Form C certificate; the certificate records no extension. Registration validity is distinct from the completion undertaking and from occupancy certification.
Registered promoter: Inspires Project; the RERA filing identifies the organization as a partnership.
RERA status in supplied record: Certificate records registration through 20/03/2025; a current extension or renewed status is not disclosed in the supplied certificate.
Land and geographic identity
Locality / neighborhood: Serlingampally; the building permit identifies the site locality as Kondapur.
Revenue village: Serlingampally is the village stated in the RERA project identity; title and permit documents refer to Kondapur Village.
Mandal: Not disclosed in the project identity fields.
District: Ranga Reddy in the RERA project identity.
PIN: 500084
Survey numbers: 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92 and 93; records also express this as “78 to 93” or “78 TO 93.” No subdivision is identified in the supplied project identity.
Plots / site identity: Plot Nos. 1001 and 1002
Registered site extent / total and net area: 501.6 m²; total area 501.6 m², net area 501.60 m², affected area recorded as 0 m².
Boundaries: East: ROAD WIDTH 9; West: PLOT NO 1015 AND 1016; North: PLOT NO 1000; South: PLOT NO 1003.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C20/04719/2019, dated 20 March, 2019; file no. 2/C20/24448/2018.
Approved built-up area: 1,445.16 m² in the RERA project fields. The permit extraction separately lists residential upper-floors area 1,204.30 m² and stilt area 227.54 m².
Building count / identified building: One building unit is recorded; the permit identifies Building - A (INSPIRE 3).
Sanctioned floor configuration: 1 Stilt + 5 upper floors; permit-extracted height 15 m.
Parking levels / provision: Stilt is approved for parking in the building permit; the permit states that approved stilt parking is to be used exclusively for vehicles. A parking-space count is not disclosed in the supplied records.
Units: 9 units in the RERA unit record; the approved-plan field records 1 building unit, not a flat count.
Offering and status
Unit type: 3BHK apartments
RERA-filed saleable area: 143.63 m² per unit
Booked / available: 0 booked / 9 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Construction stage: No independently verified site-stage evidence is supplied. RERA amenity records show varying declared percentages; these are not independent site verification.
Completion dates: TG-RERA certificate validity ends 20/03/2025. The Form B declaration separately undertakes completion by 02Feb, 2024.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records. The building permit requires an occupancy certificate before occupation.
The supplied TG-RERA record describes a residential apartment project on Plot Nos. 1001 and 1002, associated with Survey Nos. 78–93 and the Serlingampally/Kondapur location identifiers in the project and filed documents. It comprises one identified residential building, Building A (INSPIRE 3), sanctioned as 1 stilt + 5 upper floors.
The RERA unit record lists nine 3BHK apartments, all shown as available in the portal-derived snapshot, with no as-of date recorded. The filing reports 143.63 m² saleable area per unit. Drawing-based software measurement is a separate, non-RERA measurement; it is described below.
The supplied material does not establish the project’s present construction stage through an independent site inspection or a current completion certificate. Amenity progress percentages are portal-recorded declarations, not independent verification. The Form B affidavit gives a completion undertaking of 02Feb, 2024, while the registration certificate states validity through 20/03/2025; these are separate recorded dates.
The RERA land record gives a total and net site area of 501.6 m², with 0 m² affected area. The GHMC permit extraction identifies a residential building, Building A (INSPIRE 3), on a 501.6 m² site, with 1 stilt + 5 upper floors and a stated height of 15 m.
The RERA fields list approved built-up area as 1,445.16 m². The permit extraction separately reports 1,204.30 m² residential upper-floors area and 227.54 m² stilt area; these figures are kept in their recorded categories and are not treated as interchangeable.
The permit extraction records a 3.5 m setback and a compound wall length of 172.51 RM. It also lists 1 No. of RWHPs, 25 Trees, space for a transformer and a garbage house. The supplied records do not establish a detailed floor-by-floor arrangement, flats per floor, lift or stair configuration, entrances, internal circulation, landscape plan, or residential/common-area breakdown.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 9 | 0 | 9 | 143.63 m² | 82.3–90.8 m²; median 86.9 m² (software-measured) | 39% (software-derived drawing record) |
RERA records nine 3BHK units and a saleable area of 143.63 m². The booked and available counts are portal-derived and have no recorded as-of date.
The carpet-area range and median are measured by software from the approved floor-plan drawing geometry, not filed as RERA carpet-area disclosures; the drawing measurement is marked as needing review. The measurement set covers four flat designs. Carpet area, balconies and the home’s share of common areas are not the same measure: the drawing record identifies balconies as excluded from carpet area and explains that saleable area includes a share of common areas. Verify drawing measurements against the plan.
The extracted first-floor plan room record for flat 01 lists bedrooms, living/dining, kitchen, toilets and balconies. The supplied record does not provide a complete, reliable room schedule for every unit.
The GHMC permit states that the stilt is approved for parking and that approved stilt parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The RERA project fields record a mortgage area of 126.83 m², but the supplied material does not specify parking-space numbers or unit-by-unit parking allocations.
No separate resident, visitor, accessible or two-wheeler parking counts, parking layout, ramp arrangement, vehicle-entry/exit plan, pedestrian separation or EV-charging provision are established in the supplied records. A drawn parking bay, if present in the plan, would not by itself establish an exclusive allotment to a particular apartment.
The following progress percentages and availability entries are from the TG-RERA amenity record. They are declarations in that record and are not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip / TOT LOT / Park | Size not supplied | TG-RERA amenity record; permit extraction lists 25 Trees | 100% declared; independently verified status not supplied |
| Water Conservation / Rain Water Harvesting | Permit extraction lists 1 No. of RWHPs and requires a rainwater-harvesting structure (percolation pit) | 60% declared in RERA record; independently verified status not supplied | |
| Water Supply | Size, source and capacity not supplied | TG-RERA amenity record | “YES”; 50% declared; independently verified status not supplied |
| Sewerage (chamber, lines, septic tank, STP) | System details and capacities not supplied | TG-RERA amenity record | “YES”; 50% declared; independently verified status not supplied |
| Storm Water Drains | Details and capacity not supplied | TG-RERA amenity record | “YES”; 50% declared; independently verified status not supplied |
| Electrical meter room / sub-station / receiving station | Permit extraction requires space for a transformer | TG-RERA amenity record and permit extraction | “YES”; 50% declared; independently verified status not supplied |
| Internal Roads & Footpaths | Details and dimensions not supplied | TG-RERA amenity record | 0% declared |
| Street Lighting | Details not supplied | TG-RERA amenity record | 0% declared |
| Community Buildings | Details not supplied | TG-RERA amenity record | 0% declared |
| Sewage and sullage treatment/disposal | Details not supplied | TG-RERA amenity record | 0% declared |
| Solid Waste Management and Disposal | Details not supplied | TG-RERA amenity record | 0% declared |
| Energy management | Details not supplied | TG-RERA amenity record | 0% declared |
| Fire Protection and Fire Safety Requirements | Details not supplied | TG-RERA amenity record | 0% declared |
| Aggregate recreational open space | Area not supplied | TG-RERA amenity record | 0% declared |
The permit also requires a garbage house within the premises, tree planting along the periphery and in front of the premises, and a transformer space. These are permit conditions; the supplied records do not independently confirm completion.
The RERA amenity record marks water supply, sewerage, storm-water drains and electrical meter room/sub-station/receiving-station provision as “YES,” each at 50% declared progress. It records water conservation/rainwater harvesting at 60%. These entries do not identify capacities, sources, treatment processes or independent completion verification.
The permit requires an ETP as per standard specification; see Amenities, recreation & open spaces above for the permit requirements concerning a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. The supplied material does not specify ETP capacity, water storage or source, STP design, treated-water reuse, storm-water-harvesting capacity, electrical backup, lift provision or lift capacity.
The permit extraction states that an occupancy certificate is compulsory before occupation and requires a completion notice after building completion. It also lists fire protection and fire-safety requirements at 0% declared in the RERA amenity record. No fire-system details, fire clearance, escape-stair details, accessibility provision, CCTV, security arrangements or waste-segregation system are established by the supplied records.
The project identity records Serlingampally, Ranga Reddy district, PIN 500084; the building permit identifies the site locality as Kondapur. The project land record gives the east boundary as ROAD WIDTH 9 and identifies plots on the north, south and west boundaries.
The supplied location record gives the Financial District (Nanakramguda) as an anchor 1.2 km away. The provided data does not establish public-transport options, approach-road names, measured distances to other landmarks, or travel times.
The TG-RERA project fields identify INSPIRES PROJECT as a partnership promoter; the registration certificate names Inspires Project. The project record does not supply a company registration number, promoter contact details, official website, or verified registered-office address.
The building permit names M/S INSPIRES PROJECT, represented by T. Veera Reddy, as applicant and MS ELITE PROJECTS as developer/builder. These are the roles stated in that permit.
In the Form B affidavit, T. Veera Reddy, on behalf of M/S INSPIRE PROJECTS, declares a completion undertaking of 02Feb, 2024 and makes other RERA-related declarations. The supplied records do not provide independent construction-progress verification or a current occupancy/completion certificate.
| Identifier / date | P02400002876; issued 30/04/2021; validity to 20/03/2025 |
|---|---|
| What the supplied record establishes | Registration certificate for INSPIRESPROJECT; no extension is recorded on this certificate. |
| Identifier / date | Approval 2/C20/04719/2019; file 2/C20/24448/2018; dated 20 March, 2019 |
|---|---|
| What the supplied record establishes | Building A (INSPIRE 3), residential, 1 Stilt + 5 upper floors, on a stated site extent of 501.6 m². The permit requires an occupancy certificate before occupation. |
| Identifier / date | 2/C20/04719/2019, drawing record |
|---|---|
| What the supplied record establishes | Drawing source used for software-measured floor-plan information; supplied plan text is marked as needing review. |
| Identifier / date | Declaration dated 25"day of Oct, 2020 |
|---|---|
| What the supplied record establishes | Promoter-side affidavit containing a completion undertaking of 02Feb, 2024 and other declarations. |
| Identifier / date | Dated 25TH FEBRUARY 2021 |
|---|---|
| What the supplied record establishes | Advocate’s report concerning Plot Nos. 1001 and 1002, stated as 600 SQ.YDS in Survey No. 78 to 93 at Raja Rajeswaranagar, Kondapur Village. |
| Identifier / date | Search period 01-10-2000 to 10-10-2020 |
|---|---|
| What the supplied record establishes | Filed statement records one mortgage without possession dated 12-03-2019. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate is established by the records reviewed for this Overview. |
Other approval-document identifiers in the building-permit extraction include 4719/2019, LRS31052016123352 and LRS/443/CR-II/WEST ZONE/GHMC/2012. The supplied data does not include a current occupancy certificate or a publicly accessible approved-layout lookup record.
Yes. INSPIRESPROJECT is registered with the Telangana Real Estate Regulatory Authority as P02400002876; the registration status is New Project.
The promoter named in the RERA registration is INSPIRES PROJECT.
INSPIRESPROJECT is in SERLINGAMPALLY, Rangareddy, Telangana (500084).
The promoter's proposed date of completion filed with RERA is 20/03/2025. This is the promoter's declaration, not a guarantee.