Golden Tulip
GOLDEN TULIP is a residential apartment project in Turkapally, Malkajgiri mandal, Medchal-Malkajgiri district, developed by registered promoter DHATHRI INFRASTRUCTURES. The registered site covers 684.08 sq. m on plots 20, 21 and 22, identified by survey numbers 77 PART and 78 PART. It comprises one residential building configured as Stilt + 5, with 15 apartments: 10 2BHK units of 106.1 sq. m and 5 3BHK units of 140.0 sq. m. Its TG-RERA registration is P02200000470, and the promoter’s declared completion date is 13.11.2024.
At a glance
- RERA registration
- P02200000470
- Registration valid
- 14/03/2019 to 13/11/2024; certificate states five years. This is the registration period, not the completion deadline.
- Promoter
- DHATHRI INFRASTRUCTURES; partnership
- Site area
- 684.08 sq. m; building-permit record gives site area and net area as 684.08 m², with road-affected area 0 m².
- Building permit
- Greater Hyderabad Municipal Corporation (GHMC)
- Homes
- 15 units in the approved-plan and RERA project records; the RERA filing lists 10 2BHK and 5 3BHK units.
- Saleable area
- 2BHK: 106.1 sq. m; 3BHK: 140.0 sq. m
- Booked / available
- Portal-derived filing summary shows 0 booked and 10 available 2BHKs; 0 booked and 5 available 3BHKs.
The full project file
Description
Golden Tulip is a residential apartment project recorded as a new project under TG-RERA. The filing describes its project scale and records a proposed completion date of 13/11/2024.
- Project type
- Residential (apartment)RERA filing
- Units
- 15RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 684.08 sq mRERA filing
- Possession
- 13/11/2024RERA filing
- Status
- New ProjectRERA filing
Gallery


Configurations & sizes
The project is filed with 2BHK and 3BHK configurations. Carpet areas measured from the approved drawings are not available in the supplied measurements; these figures are not RERA disclosures and should be verified against the drawings. The TG-RERA filing records 10 2BHK units, 0 booked, with saleable area of 106.1 sq m, and 5 3BHK units, 0 booked, with saleable area of 140.0 sq m.
| Type | Saleable | Source |
|---|---|---|
| 2BHK | 106.1 sq m | RERA filing |
| 3BHK | 140.0 sq m | RERA filing |
Amenities
The disclosed project features include residential amenities and infrastructure such as parking, security, a lift, water supply and rainwater harvesting.
- Visitor parking
- Vastu Compliant
- Security
- CCTV Cameras
- Compound
- Covered Car Parking
- Lift
- 24Hrs Backup Electricity
- Vastu / Feng Shui compliant
Specifications
- doors
- Main Door & Internal Door s - Engineered wood / Teak wood frame & Teak Veneered shutter aesthetically designed and finished with melamine polish fixed with reputed make hardware of the best brand. French Doors - UPVC door frames with float glass paneled sliding shutters with provision for mosquito mesh track. Windows - UPVC window system with float glass with provision for mosquito mesh track with
- drinking water
- Provision for Water from RO system would be provided.
- electrical
- Concealed PVC pipes, multistrand copper wiring (Finecab or equivalent) with DBG, MCBs. Modular switches with 3 phase meter. Provision for Internet, telephone and generator.
- flooring
- 2' x 2' Vitrified tiles of CERA or equivalent make in all rooms and anti-skid tiles for balcony & utility areas.
- generator
- DG back-up for common areas and for all fans and lights in all flats.
- kitchen
- Granite platform with built-in stainless steel sink & glazed tile dado up to 2' height.
- lift
- 6 passengers lift of Johnson or equivalent make with granite cladding in the stilt floor.
- painting
- Whole flat is putty finished with plastic emulsion paint and External painting (APEX of equivalent) with putty or texture.
- plumbing
- CPVC pipes for water supply and SWR for external drain lines.
- security
- CCTV surveillance shall be provided for common areas.
- structure & super structure
- RCC framed structure with TMT bars of ISI make. Table molded red bricks or AAC blocks with two coats plastering on both inside and outside with sponge finish.
- toilets
- Ceramic designer tiles up to door height with sanitary fitting of Hindware or equivalent make. CP fittings of Jaguar or equivalent.
Location & connectivity
The developer gives the location as Bolarum–Turkapally Road, New Bolarum, Secunderabad. The project is in Turkapally, Malkajgiri mandal, Medchal-Malkajgiri district.
Promoter
The promoter is DHATHRI INFRASTRUCTURES, a partnership. Its official website and count of other registered projects are not disclosed; the filing names SHRI BASITH ALI as architect and MOHD MAQSOOD ANSARI as structural engineer.
Additional details
Sources & web results
- squareyards.com
- Dhathri Golden Tulip in Bolaram, Hyderabadcommonfloor.com
- Dhathri Golden Tulip Turkapally, Hyderabad99acres.com
- GOLDEN TULIP Ranga – RERA No. P02200000470aurumproptech.in
- Flats for Rent in Dhathri Golden Tulip Bolarum Hyderabadnobroker.in
- Dhathri Golden Tulip FAQs - Turkapally, Hyderabad99acres.com
- GOLDEN TULIP | 2BHK,3BHK | Turkapally | Photos & Reviewsbhumiboss.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- GOLDEN TULIP
- Developer / Promoter
- DHATHRI INFRASTRUCTURES
- Project type
- Residential
- RERA Registration No.
- P02200000470
- Registration Status
- New Project
- Approved on
- 13/11/2018
- Proposed completion
- 13/11/2024
- Approving authority
- GHMC
- Plan approval no.
- 2/C27/17646/2018
- Total site area
- 684 sq m (0.2 acres)
- Approved built-up area
- 1,660 sq m (0.4 acres)
- Buildings (approved plan)
- 1
- Locality
- TURKAPALLY
- Mandal
- Malkajgiri
- District
- Medchal-Malkajgiri
- PIN code
- 500047
- Documents on File
- 13
Frequently asked questions
Is GOLDEN TULIP registered with Telangana RERA?
Yes. GOLDEN TULIP is registered with the Telangana Real Estate Regulatory Authority as P02200000470; the registration status is New Project.
Who is the developer of GOLDEN TULIP?
The promoter named in the RERA registration is DHATHRI INFRASTRUCTURES.
Where is GOLDEN TULIP located?
GOLDEN TULIP is in TURKAPALLY, Malkajgiri, Medchal-Malkajgiri, Telangana (500047).
When will GOLDEN TULIP be completed?
The promoter's proposed date of completion filed with RERA is 13/11/2024. This is the promoter's declaration, not a guarantee.