VNS ENCLAVE WEST is a residential apartment project in Fathullaguda, Uppal mandal, Ranga Reddy district, developed by the registered promoter Vnsconstructions. The project covers 575.94 m² and comprises one proposed residential building with 1 Stilt + 5 upper floors and 15 apartments: 10 2BHK and 5 3BHK. It is registered with TG-RERA under P02400001966, with a proposed completion date of 30/11/2022.

📍 See this location on the map
Fathullaguda, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameVNS ENCLAVE WEST RERA record
Project type / registered portionResidential apartment project; the certificate identifies the registered project, but a separately named phase or phase-wise scope is not disclosed. RERA record
TG-RERA registrationP02400001966; issued 06/07/2020; validity recorded as 06/07/2020 through 30/11/2022. The certificate records no extension. Registration validity is distinct from the building-permit validity and the project completion date. RERA record
Registered promoterVnsconstructions on the TG-RERA certificate; the RERA filing also names VNSCONSTRUCTIONS / VNS CONSTRUCTIONS. RERA record Corporate record
RERA status in supplied recordNew Project; registration certificate issued under section 5. The record does not establish a current registration extension or current status beyond the certificate. RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageFathullaguda / FATHULLAGUDA. The building permit describes the locality as Madhura Nagar (Fathullaguda). RERA record Land records
MandalUPPAL in the GHMC building permit; the RERA land-identity fields do not disclose a mandal. Land records
DistrictRanga Reddy in the RERA project record and registration certificate. RERA record
PIN500068. RERA record
Survey numbers / subdivisions46, 50 and 50P in the TG-RERA certificate and RERA land record; the GHMC permit describes 46, 50 and 50 PART. Land records
Site extent575.94 m²; the RERA land record gives total area and net area as 575.94 m², with affected area 0. The building permit also states site area 575.94 m², road-affected area 0 and nala-affected area 0. Land records
Boundaries in RERA filingEast: “PART OF OPEN LAND OF M PADMA”; west: “SURVEY NO 50”; north: “SURVEY NO 50 PART”; south: “ROAD WIDTH 9 MTS”. RERA filing
Registered site addressThe RERA filing identifies Fathullaguda, Ranga Reddy, Telangana, PIN 500068; a more specific street address is not disclosed in the registration certificate. RERA record

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building-permit number and date2/C3/03991/2020, approved 19 March, 2020. Related file number: 2/C3/16058/2019. Approvals record
Approved buildingOne proposed residential building, identified in the permit as “Building - PROPOSED-1 (VSN CONSTRUCTIONS)”.
Sanctioned configuration1 Stilt + 5 upper floors; stated height 14.99 m. A basement or podium is not listed.
Approved built-up areaGHMC permit schedule states Residential 1,333.60 and Stilt 265.87; the RERA project record separately lists “Approved Built up Area” as 1333.60 Sqmts. These are the figures as labelled in their respective records. RERA filing
Unit countRERA filing: 15 units total—10 2BHK and 5 3BHK. The supplied permit extraction does not state an approved unit count. RERA unit table RERA unit details
Parking / mortgaged areaRERA filing records 142.88 Sqmts as “Mortgage Area”; the permit schedule labels FIRST FLOOR 142.88. A parking-space count or allocation is not established by the supplied evidence. RERA filing

Offering and status

FieldRecord
RERA-filed configurations2BHK and 3BHK apartments. RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 96.89 sq.m; 3BHK: 120.0 sq.m. RERA unit table RERA unit details
Booked / availablePortal figures show 2BHK: 0 booked / 10 available; 3BHK: 0 booked / 5 available. The portal record supplies no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageThe RERA identity record reports 80% completeness; this is a recorded project figure, not an independently verified site inspection. RERA record
Completion dateRERA project record: proposed completion 30/11/2022. Form B, dated 28 day of may 2020, contains a promoter undertaking to complete in 30 month. The supplied record does not identify a revised completion date. RERA record
Building-permit timelineGHMC permit states construction should commence before 19 September, 2021 and be completed before 19 March, 2026; the permit also states validity up to 19 March, 2026. This is not the TG-RERA registration validity.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The GHMC permit states an occupancy certificate is required before occupation. Document index

2. The project story

  • VNS ENCLAVE WEST is registered with TG-RERA as a residential apartment project in Fathullaguda, Ranga Reddy district, on Survey Nos. 46, 50 and 50P. Its registered site area is 575.94 m². The GHMC building permit covers one proposed residential building at Madhura Nagar (Fathullaguda), described as Survey Nos. 46, 50 and 50 PART, with a configuration of one stilt level and five upper floors. RERA record Land records
  • The RERA filing lists 15 apartments: 10 2BHK and 5 3BHK. The portal’s last-read inventory lists all 15 as available, but no as-of date accompanies those counts. The record reports 80% completeness; that figure is not an independent site-verification result. The RERA completion date is 30/11/2022, while the supplied GHMC permit gives a separate building completion date of 19 March, 2026. No occupancy or completion certificate is supplied, so the reviewed material does not establish that any tower or phase has been occupancy-certified. RERA unit table RERA unit details RERA record Document index
  • The GHMC order describes a proposed building and requires a commencement notice before construction and a completion notice and occupancy certificate after completion. The record provided here does not establish the building’s present physical condition or whether those notices and certificates have since been issued.

3. Master plan, architecture & building design

  • The sanctioned development is one residential building on a 575.94 m² site. GHMC’s permit describes 1 Stilt + 5 upper floors, with a stated height of 14.99 m. It records Residential 1,333.60 and Stilt 265.87 in its schedule; the RERA filing labels 1,333.60 Sqmts as approved built-up area. These are the source-labelled figures; no FSI-counted area or gross-built-up-area breakdown is supplied. RERA filing
  • The supplied floor-plan record identifies a first-floor plan at scale 1:100 and contains measured apartment layouts, but does not provide a complete verified description of building footprint, flats per floor, lift or stair count, circulation, entrances, or internal site arrangement. The approved plan document is listed as 112527, but its extracted content is not available in the project document index. Floor plans RERA unit details Document index
  • The GHMC schedule records 25 Trees, a compound wall, and site space for a transformer. The permit’s amenities/utility schedule records Tot-lot as 0 m². No evidenced site plan details establish landscaped or open-space areas, internal roads, or a phase-wise organization.

4. Homes, configurations & floor plans

RERA records 15 apartments across two configurations. The saleable areas below are RERA-filed. Carpet areas and loading figures are software-measured from the supplied approved-plan drawings, not RERA disclosures; they should be checked against the drawings. The measured carpet area excludes the separately labelled balcony areas, while RERA saleable area includes the home’s share of common areas and is not interchangeable with carpet area. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001096.89 sq.m62.2–66.8 sq.m; median 64.4 sq.m34%
3BHK505120.0 sq.m74.9–75.0 sq.m; median 74.9 sq.m38%
  • For one measured 2BHK drawing (flat 03), the plan labels a drawing room, dining, two bedrooms, kitchen, wash area, toilet and balcony. The balcony is separately identified and excluded from the software-measured carpet area. For one measured 3BHK drawing (flat 02), the plan labels a drawing room, dining/kitchen, three bedrooms, two toilets, wash area and two balconies; the balconies are excluded from measured carpet area. Room dimensions are drawing-derived software measurements, not RERA-filed room specifications. RERA unit details
  • The measurement set covers four 2BHK designs and two 3BHK designs. The drawing register says eight drawings are present, one is measured and seven scans are pending; the configuration-level measurements are therefore limited to the designs the software measured. Floor plans RERA unit details

5. Parking & vehicle circulation

  • The RERA filing records 142.88 Sqmts as “Mortgage Area,” and the GHMC schedule lists FIRST FLOOR 142.88. Neither item establishes the number or type of parking spaces, whether parking is resident or visitor parking, or how spaces are allocated to individual apartments. The supplied record does not establish parking levels beyond the building’s sanctioned stilt level, nor describe ramps, driveways, accessible parking, pedestrian separation, or EV charging. RERA filing
  • Covered car parking appears in third-party vendor information, not as a verified parking count or allotment in the supplied TG-RERA documents; it is therefore not treated here as a confirmed provision. Promoter website

6. Amenities, recreation & open spaces

The RERA amenities register lists 14 facilities or infrastructure categories. Its progress field is 0 for each item; water supply, rainwater harvesting and the electrical meter room/sub-station/receiving station are marked “YES,” with the same recorded progress value. These are filing entries, not independent confirmation of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsNo size suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Water SupplyMarked “YES”; no source or capacity suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Sewerage (Chamber, Lines, Septic Tank, STP)No capacity or system detail suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Storm Water DrainsNo size suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Green Strip/TOT LOT/ParkNo size supplied; GHMC schedule states Tot-lot 0 m²RERA amenities register; GHMC permit0% recorded; completion not independently verified. RERA amenities
Street LightingNo detail suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Community BuildingsNo description or size suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Treatment and Disposal of Sewage and Sullage WaterNo capacity or process suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Solid Waste Management and DisposalNo method or capacity suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Water Conservation / Rainwater HarvestingMarked “YES”; GHMC permit requires a rainwater-harvesting percolation pitRERA amenities register; GHMC permit0% recorded in register; completion not independently verified. RERA amenities
Energy ManagementNo detail suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities
Fire Protection and Fire Safety RequirementsNo system details suppliedRERA amenities register; GHMC permit0% recorded; completion not independently verified. RERA amenities
Electrical Meter Room, Sub-Station, Receiving StationMarked “YES”; permit requires transformer spaceRERA amenities register; GHMC permit0% recorded in register; completion not independently verified. RERA amenities
Aggregate area of recreational open spaceNo area suppliedRERA amenities register0% recorded; completion not independently verified. RERA amenities

7. Utilities, building services & safety

  • Water and drainage: The RERA amenities register marks water supply and rainwater harvesting “YES,” but gives no water source, storage, treatment capacity, or reuse details. It lists sewerage, sewage/sullage treatment and storm-water drains, with 0% recorded for each and no system capacities. GHMC’s permit requires a rainwater-harvesting percolation pit. RERA amenities
  • Electrical and vertical transportation: The RERA register marks an electrical meter room/sub-station/receiving station “YES”; the GHMC permit requires space for a transformer. No electrical capacity, backup power, lift count, lift capacity, or service-lift provision is established by the supplied project documents. RERA amenities Document index
  • Fire and life safety: Fire protection and fire-safety requirements appear in the RERA amenities register, but its progress is recorded as 0% and no system specifications are supplied. The GHMC permit states that an occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate, and that the occupancy certificate is compulsory before occupation. The supplied evidence does not establish that either certificate has been obtained. RERA amenities
  • Waste and accessibility: The RERA register lists solid-waste management and disposal, but records 0% and supplies no method or capacity. The GHMC permit requires a garbage house within the premises. No project-specific accessibility features, CCTV, access-control arrangements, or accessible circulation details are established in the supplied RERA documents. RERA amenities Document index

8. Location, access & connectivity

  • The registered revenue location is Fathullaguda, Ranga Reddy district, Telangana, PIN 500068; the GHMC permit identifies Madhura Nagar (Fathullaguda) and Uppal mandal. The permit records a 9 m southern boundary road in the RERA filing, while the building-permit extraction lists 18 mt. road widths without identifying a specific road segment in the supplied extract. RERA record Land records
  • The supplied cadastral parcel-centroid location is 17.41528, 78.35459. A software-listed connectivity point is Financial District (Nanakramguda), at 1.2 km; this is a location-data distance, not a stated travel time. Location record
  • The supplied project documents do not provide verified public-transport routes, bus or railway distances, or a detailed approach-road description. Location record Document index

9. Developer & development status

  • The registered promoter is Vnsconstructions / VNSCONSTRUCTIONS, identified in the RERA filing as a Partnership. The certificate gives the promoter office only as Village/Mandal/District fields with Ranga Reddy district and PIN 500068; the project filing gives an address at VILLA NO 159, INDUARANYA HARITHA, BANDLAGUDA, FATHULLAGUDA, Ranga Reddy, 500068. Corporate record RERA record
  • The RERA filing names NARSIMHA REDDY VUPPALA as authorized signatory and lists SRINIVASA REDDY K, SUNANDA DEVI VUPPALA, and VIJAYAPAL REDDY PAILLA as partners. Form B is dated 28 day of may 2020 and contains the promoter’s declaration of a 30 month completion period and other project-account, audit, and approval undertakings. Parties record
  • The RERA project record reports 80% completeness, but the supplied material does not include an independently verified construction inspection or a current progress report establishing physical completion. The registration certificate records validity through 30/11/2022 and no extension on that certificate; the GHMC permit separately records construction completion before 19 March, 2026. No occupancy/completion certificate is included. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400001966; issued 06/07/2020; valid through 30/11/2022 as stated on certificate
What the supplied record establishesRegisters VNS ENCLAVE WEST under section 5; certificate records no extension.
GHMC building-permit order / commencement approval
Identifier / dateApproval 2/C3/03991/2020; file 2/C3/16058/2019; 19 March, 2020
What the supplied record establishesPermit for one proposed residential building on Survey Nos. 46, 50 and 50 PART, with 1 Stilt + 5 upper floors.
RERA Form B declaration
Identifier / date28 day of may 2020
What the supplied record establishesPromoter declaration concerning title documentation, encumbrances, completion period and project-account/audit obligations.
Title documents filed with RERA
Identifier / dateSale Deed 1707/2019; title report dated 05.04.2019; related title records in documents 112505–112514
What the supplied record establishesIncludes the filed deed and advocate’s title opinion and supporting title-chain documents.
Building-plan drawing record
Identifier / dateDocument 112527
What the supplied record establishesListed as a building/floor-plan document; supplied drawing measurements support the limited software-measured apartment information above. The document index does not provide an extracted full-plan description. Document index Floor plans RERA unit details
Layout approval / layout-plan records
Identifier / dateDocuments 112515–112521 and 112516–112520
What the supplied record establishesListed in the RERA file under layout-plan document slots; extracted plan content is not supplied. Document index
Occupancy / completion certificates
Identifier / dateNot present in supplied documents
What the supplied record establishesNo certificate or issue date is established by the reviewed record. Document index

The GHMC permit states that its permission does not confer ownership rights, requires construction to follow the sanctioned plan, and requires an occupancy certificate before occupation. The overview records these as permit terms; it does not establish subsequent compliance or certificate issuance.

Due-diligence summary

Risk & red flags

1 high
  • Completion date has passed and the project is not complete
Full details: coming soon

Land & title

Nothing confirmed
  • Land record and title documents checked.
  • Nothing confirmed found in records checked.
Searched: Bhu Bharati land record, IGRS registration records, title documents
Full details: coming soon

Approvals

On file
  • plan approval 2/C3/03991/2020 in the RERA filing.
Searched: RERA filing, HMDA/DTCP/GHMC approvals
Full details: coming soon

Legal

Searched
  • Court and regulator records searched for this project.
  • No TG-RERA proceedings found.
Searched: eCourts, High Court, consumer forums, TG-RERA orders
Full details: coming soon

Contacts

  • Promoter: VNSCONSTRUCTIONS (RERA filing).
  • Architect, engineer and other filed contacts in the full file.
Full details: coming soon

Frequently asked questions

Is VNS ENCLAVE WEST registered with Telangana RERA?

Yes. VNS ENCLAVE WEST is registered with the Telangana Real Estate Regulatory Authority as P02400001966; the registration status is New Project.

Who is the developer of VNS ENCLAVE WEST?

The promoter named in the RERA registration is VNSCONSTRUCTIONS.

Where is VNS ENCLAVE WEST located?

VNS ENCLAVE WEST is in FATHULLAGUDA, Rangareddy, Telangana (500068).

When will VNS ENCLAVE WEST be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2022. This is the promoter's declaration, not a guarantee.

More projects in Rangareddy