Vayuputhra Green Field Highway City

VAYUPUTHRA GREEN FIELD HIGHWAY CITY is a plotted development at Narayanapuram village, Kallur Mandal, Khammam District. The registered promoter is Dandu Ramarao and Others. The project has a land area of 18513.71 sqmts and a draft layout approval for 61 plots; plot configurations, tower or block counts, and floor counts are not stated. It is registered under TG-RERA number P00800009364, with a proposed completion date of 14/09/2025.

At a glance

RERA registration
P00800009364
Registration valid
15/09/2023 to 14/09/2025; the certificate states no extension. This is the registration period, not a current confirmation of registration status.
Promoter
Dandu Ramarao and Others
Site area
Total area 18513.71 sqmts; net area 18513.71 sqmts; area stated as affected by road widening/FTL of tanks/nala widening 0.
Booked / available
Not supplied in the evidence provided for this overview.
Construction stage
The RERA registration record does not establish independently inspected site progress.
Occupancy certificate
No occupancy or completion certificate is included in the supplied documents. The evidence does not establish whether one has since been issued.

The full project file

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

Vayuputhra Green Field Highway City is a plotted development in Narayanapuram. The TG-RERA filing records the project as a new project on a land area of 18513.71 sq m, with 14/09/2025 as the proposed completion date.

Project type
Plotted DevelopmentRERA filing
Land area
18513.71 sq mRERA filing
Possession
14/09/2025RERA filing
Status
New ProjectRERA filing

Configurations & sizes

The project is filed as a plotted development; the approved drawing scans are pending, so no carpet area can be measured from them. The developer advertises built-up area of 10976.22 sqmts and saleable area of 18513.71 sqmts.

TypeBuilt-upSaleableSource
Plotted Development10976.22 sqmts18513.71 sqmtsaurumproptech

Amenities

The filed amenities include a green strip, tot lot or park, alongside infrastructure such as internal roads, water supply and sewerage.

1 amenity
  • Green Strip/TOT LOT/Park

Specifications

Utilities
Water Supply, Sewerage, Storm Water Drains, Street Lighting

Location & connectivity

The project is in Narayanapuram Village, Kallur Mandal, Khammam district, Telangana.

Narayanapuram, Kallur Mandal, Khammam
📍 Open in Maps

Promoter

The promoter is Dandu Ramarao and Others; its entity type is not disclosed. The named architect is KOTA SIVA PRATHYUSHA and the named structural engineer is N VENKATA RAO.

Dandu Ramarao and Others

Sources & web results

Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
VAYUPUTHRA GREEN FIELD HIGHWAY CITY
Developer / Promoter
Dandu Ramarao and Others
Project type
Plotted Development
RERA Registration No.
P00800009364
Registration Status
New Project
Approved on
15/09/2023
Proposed completion
14/09/2025
Approving authority
DTCP
Plan approval no.
364/2023/WRO/W
Total site area
18,514 sq m (4.6 acres)
Approved built-up area
10,976 sq m (2.7 acres)
Locality
KALLURU MANDAL, Narayanapuram
Mandal
Kallur Mandal
District
Khammam
PIN code
507209
Documents on File
18

Frequently asked questions

Is VAYUPUTHRA GREEN FIELD HIGHWAY CITY registered with Telangana RERA?

Yes. VAYUPUTHRA GREEN FIELD HIGHWAY CITY is registered with the Telangana Real Estate Regulatory Authority as P00800009364; the registration status is New Project.

Who is the developer of VAYUPUTHRA GREEN FIELD HIGHWAY CITY?

The promoter named in the RERA registration is Dandu Ramarao and Others.

Where is VAYUPUTHRA GREEN FIELD HIGHWAY CITY located?

VAYUPUTHRA GREEN FIELD HIGHWAY CITY is in KALLURU MANDAL, Narayanapuram, Kallur Mandal, Khammam, Telangana (507209).

When will VAYUPUTHRA GREEN FIELD HIGHWAY CITY be completed?

The promoter's proposed date of completion filed with RERA is 14/09/2025. This is the promoter's declaration, not a guarantee.