Aditya Enclave
ADITYA ENCLAVE is a plotted development in Madikonda, GWMC Mandal, Warangal Urban district. The registered promoter is SRI LAXMI NARASIMHA SWAMY SLNS BUILDERS AND DEVELOPERS. The RERA land record states a total and net area of 18,205.00 sq m; the layout identifies 65 plots, with sizes ranging from 128.68 sq m (153.9 sq yd) to 288.22 sq m (344.7 sq yd), and no tower or floor configuration is disclosed. Its TG-RERA registration number is P00300008992, and its proposed completion date is 30/11/2024.
At a glance
- RERA registration
- P00300008992; registered 30/11/2022. The certificate states validity from 30/11/2022 to 30/11/2024 and no extension is recorded in the supplied certificate.
- Promoter
- SRI LAXMI NARASIMHA SWAMY SLNS BUILDERS AND DEVELOPERS; partnership.
- Building permit
- Greater Warangal Municipal Corporation (GWMC) / GWMC Municipality or Municipal Corporation, as stated in the filed layout records.
- Booked / available
- Not supplied in the evidence reviewed for this Overview.
- Construction stage
- RERA record says 70% completeness; this is a record value, not an independently verified site inspection.
- Occupancy certificate
- No occupancy or completion certificate is included in the supplied records. The project is a plotted layout; the supplied material does not identify a tower- or phase-specific OC.
The full project file
Description
The TG-RERA filing records 65 plots and the project as ongoing, with a proposed completion date of 30 November 2024.
- Project type
- Plotted DevelopmentRERA filing
- Land area
- 18205.00 sq mRERA filing
- Possession
- 30/11/2024RERA filing
- Status
- On-Going ProjectRERA filing
Configurations & sizes
The developer’s marketing lists 3 BHK, 4 BHK and plot configurations, and advertises plot built-up areas of 1,385–3,102 sq ft. Carpet areas measured from the approved drawings, and TG-RERA unit, booking and saleable-area figures, are not available in the digest.
| Type | Built-up | Source |
|---|---|---|
| 3 BHK | aurumproptech | |
| 4 BHK | aurumproptech | |
| Plot | 1,385 - 3,102 sq ft | aurumproptech |
Amenities
The disclosed project features include a green strip/park and receiving station, alongside listed infrastructure such as internal roads, water supply and sewerage.
- Green Strip/TOT LOT/Park
- Receiving Station
Location & connectivity
The project is in Madikonda, Warangal Urban district, with the marketing address given as Madikonda, Warangal.
Promoter
The promoter is SRI LAXMI NARASIMHA SWAMY SLNS BUILDERS AND DEVELOPERS, a partnership. The number of its other registered projects, an official website and named project architect or engineer are not disclosed.
Sources & web results
- Sri Aditya Enclave Madikonda, Warangal99acres.com
- ADITYA ENCLAVE Warangal Urbanaurumproptech.in
- housing.com
- Sri Aditya Enclave FAQs - Madikonda, Warangal99acres.com
- Aditya Enclave - Madikonda, Warangalaurumproptech.in
- Sri Aditya Enclave Location Map Kazipet, Warangalhousing.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- ADITYA ENCLAVE
- Developer / Promoter
- SRI LAXMI NARASIMHA SWAMY SLNS BUILDERS AND DEVELOPERS
- Project type
- Plotted Development
- RERA Registration No.
- P00300008992
- Registration Status
- On-Going Project
- Approved on
- 30/11/2022
- Proposed completion
- 30/11/2024
- Approving authority
- DTCP
- Total site area
- 18,205 sq m (4.5 acres)
- Approved built-up area
- 11,314 sq m (2.8 acres)
- Locality
- MADIKONDA
- District
- Hanamkonda
- PIN code
- 506142
- Documents on File
- 23
Frequently asked questions
Is ADITYA ENCLAVE registered with Telangana RERA?
Yes. ADITYA ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P00300008992; the registration status is On-Going Project.
Who is the developer of ADITYA ENCLAVE?
The promoter named in the RERA registration is SRI LAXMI NARASIMHA SWAMY SLNS BUILDERS AND DEVELOPERS.
Where is ADITYA ENCLAVE located?
ADITYA ENCLAVE is in MADIKONDA, Hanamkonda, Telangana (506142).
When will ADITYA ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2024. This is the promoter's declaration, not a guarantee.