thePropCheck AI property due diligence
Sign in

Himalaya Constructions

All projects by Himalaya Constructions

ANJANADRI
ANJANADRI
Himalaya Constructions
Osmannagar, Rc Puram mandal, Sangareddy
Residential
ANJANI RESIDENCY
ANJANI RESIDENCY
Himalaya Constructions
Maktha Mahaboob Peta, Maredpally mandal, Hyderabad
Residential
GARUDADRI
GARUDADRI
Himalaya Constructions
Osman Nagar, Sangareddy
Residential
GOVIND SAI RESIDENCY
GOVIND SAI RESIDENCY
Himalayaconstructions
Hafeezpet, Serilingampally mandal, Rangareddy
Residential
HIMANY RESIDENCY
HIMANY RESIDENCY
Himalayaconstructions
Madeenaguda, Serilingampally mandal, Rangareddy
Residential
KRISHNA SAI RESIDENCY
Himalaya Constructions
Ameenpur, Sangareddy
Residential
LAKSHMI RESIDENCY
Himalaya Constructions
Beeramguda, Ameenpur mandal, Sangareddy
Residential
NARAYANADRI
Himalaya Constructions
Osman Nagar, Rc Puram mandal, Sangareddy
Residential
NEELADRI
NEELADRI
Himalaya Constructions
Osman Nagar, Sangareddy
Residential
SESHADRI
Himalaya Constructions
Osman Nagar Village Under Tellapur, Sangareddy
Residential
VENKATADRI
VENKATADRI
Himalaya Constructions
Osmannagar, Rc Puram mandal, Sangareddy
Residential
VRUSHABHADRI
VRUSHABHADRI
Himalaya Constructions
Osmannagar, Rc Puram mandal, Sangareddy
Residential

Himalaya Constructions at a glance

Himalaya Constructions has 12 projects registered with the Telangana RERA, in 3 districts: Sangareddy (9), Rangareddy (2), Hyderabad (1). 10 were registered as new projects and 2 as ongoing projects (already under way when registered). All 12 are residential projects.

Registrations run from 2019 to 2024; 2023 saw the most (6). By year of registration: 2019: 2 · 2021: 1 · 2022: 1 · 2023: 6 · 2024: 2. Most recently registered: Narayanadri (Apr 2024), Lakshmi Residency (Mar 2024) and Venkatadri (Aug 2023).

The unit tables filed for 12 projects list 190 homes in all; the largest are Anjanadri (20 homes), Govind Sai Residency (20 homes) and Narayanadri (20 homes). Plans were approved by HMDA for 8 projects, GHMC for 3 projects and DTCP for 1 project. Of the 12 projects with a filed completion date (latest revision), 3 fall due later and the date has passed for 9.

Projects by mandal: Rc Puram, Sangareddy (4), Ameenpur, Sangareddy (2), Serilingampally, Rangareddy (2) and Maredpally, Hyderabad (1).

Counts come from the registrations filed with the Telangana RERA; a project that did not file a figure is left out of that count.