thePropCheck AI property due diligence
Sign in

Jubilee Constructions

All projects by Jubilee Constructions

JUBILEE AASHIRWAD
JUBILEE AASHIRWAD
Jubilee Constructions
Hanmakonda, Hanamkonda
Residential
JUBILEE EMERALD
JUBILEE EMERALD
Jubilee Constructions
Kondapur, Serilingampally mandal, Rangareddy
Residential
JUBILEE HEMALATHA RESIDENCY
JUBILEE HEMALATHA RESIDENCY
Jubilee Constructions
Nakkalagutta Hanmakonda, Hanamkonda mandal, Hanamkonda
Residential
JUBILEE MANGALAM A
Jubilee Constructions
Shayampet, Hanamkonda mandal, Hanamkonda
Residential
JUBILEE MANGALAMA B
Jubilee Constructions
Shayampet, Hanamkonda mandal, Hanamkonda
Residential
JUBILEE SHUBHA TULASI
JUBILEE SHUBHA TULASI
Jubilee Constructions
Nagole, Uppal mandal, Medchal-Malkajgiri
Residential
JUBILEE SRINIVASAM
Jubilee Constructions
Nayeem Nagar, Hanamkonda mandal, Hanamkonda
Residential
RATNAKARA RESIDENCY
Jubilee Constructions
Nakkalagutta, Hanamkonda mandal, Hanamkonda
Residential

Jubilee Constructions at a glance

Jubilee Constructions has 8 projects registered with the Telangana RERA, in 3 districts: Hanamkonda (6), Rangareddy (1), Medchal-Malkajgiri (1). All 8 projects with a filed status were registered as new projects. All 8 are residential projects.

Registrations run from 2018 to 2024; 2024 saw the most (4). By year of registration: 2018: 1 · 2021: 1 · 2022: 2 · 2024: 4. Most recently registered: Jubilee Hemalatha Residency (Jul 2024), Jubilee Shubha Tulasi (May 2024) and Ratnakara Residency (Apr 2024).

The unit tables filed for 8 projects list 81 homes in all; the largest are Jubilee Aashirwad (15 homes), Ratnakara Residency (15 homes) and Jubilee Emerald (10 homes). Plans were approved by DTCP for 7 projects and GHMC for 1 project. Of the 8 projects with a filed completion date (latest revision), 3 fall due later and the date has passed for 5.

Projects by mandal: Hanamkonda, Hanamkonda (5), Serilingampally, Rangareddy (1) and Uppal, Medchal-Malkajgiri (1).

Counts come from the registrations filed with the Telangana RERA; a project that did not file a figure is left out of that count.