Lacasa CABEZA

Sudheer Kumar Gangireddy · Medchal-Malkajgiri · RERA P02200001888

Lacasa CABEZA is a residential apartment project in Gajula Ramaram, Qutbullapur mandal, Medchal-Malkajgiri district, developed by registered promoter Sudheer Kumar Gangireddy. It is on a registered site extent of 523.95 sq m and comprises one building with a stilt level and five upper floors, with 10 three-bedroom units. The project is registered under TG-RERA registration number P02200001888, with proposed completion on 25/07/2024.

Project at a glance

Project identity

FieldProject record
Registered nameLacasa CABEZA RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionNo phase name is disclosed. The registration covers the project on Survey No. 307/E/A; the filed record describes one building. RERA record Land records
TG-RERA registrationP02200001888
Registration validity21/03/2020 to 25/07/2024; certificate says four years, unless extended by the Authority. No extension is recorded in the supplied certificate.
Registered promoterSudheer Kumar Gangireddy RERA record
RERA statusThe project is recorded as a “New Project.” Registration validity ended on 25/07/2024; the supplied record does not show an extension. Registration validity is distinct from the completion date and from occupancy-certificate status. RERA filing

Land and geographic identity

FieldProject record
Locality / revenue villageGajula Ramaram; also written as Gajularamaram in the filed approval documents. RERA record RERA filing
MandalQutbullapur is recorded in the building-plan extraction.
District / PINMedchal-Malkajgiri / 500072 RERA record RERA filing
Survey number and subdivision307/E/A RERA record Land records
Plot identifiersPlots 145P, 146 and 147; the registration certificate describes these as “plots 145p 146 147.” RERA filing
Registered site extent523.95 sq m RERA filing
Total / net areaTotal area 523.95 sq m; net area 523.95 sq m. RERA filing
Boundaries in RERA filingNorth: plots 124, 125 and 126; south: 40 ft road; east: neighbour land; west: 145P. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalApproval No. 2/C26/12392/2018, dated 25 July 2018; the building-plan extraction also records 26-07-2018. Approvals record
Approved developmentOne proposed residential building, “PROPO BLDG (RESIDENCE),” on Survey No. 307/E/A.
Sanctioned floors / heightStilt + 5 upper floors; the plan records building height 14.90 m and total height 20.15 m.
Approved built-up areaThe plan records total built-up area 1511.13 sq m, including residential net BUA 1259.27 sq m. The permit extraction separately records residential upper-floor area 1,259.25 sq m and stilt area 240.09 sq m. These are figures as stated in the respective filed documents.
Approved / RERA-declared unitsThe building plan records 10 dwelling units; the RERA filing records 10 units. RERA unit table
Parking levelsThe building-permit record says stilt and cellar approved for parking; the supplied plan extraction lists proposed number of parkings as 0. The number of actual spaces is not established in the supplied record.

Offering and status

FieldProject record
RERA-filed configurationThree-bedroom (“THREE BEDROOM” / 3BHK), 10 units RERA unit table RERA unit details
RERA-filed saleable area62.98 sq m per unit RERA unit table RERA unit details
Booked / available0 booked and 10 available in the portal record as last read; no as-of date is supplied, so these counts are indicative. RERA unit table RERA unit details
Mortgage designationRERA unit record marks the units as mortgaged; the supplied record does not establish unit-specific release or allocation. RERA unit table
Completion datesThe RERA registration record gives proposed completion as 25/07/2024. The Form B declaration records an undertaking to complete by 3/4/2021. RERA record
Construction stageNo independently verified site-progress assessment is supplied. The amenity disclosure records progress values for the listed items, but does not establish overall construction completion. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The approved documents require an occupancy certificate before occupation. Document index

The project story

Lacasa CABEZA is recorded with TG-RERA as a residential apartment project on 523.95 sq m at plots 145P, 146 and 147, Survey No. 307/E/A, in Gajula Ramaram, Medchal-Malkajgiri district. The filed GHMC approval describes one proposed stilt-plus-five-floor residential building; the RERA filing and building plan each record 10 dwelling units. RERA record RERA filing

The RERA filing lists ten three-bedroom units, with none shown as booked and all ten shown as available in the portal data last read. That inventory has no stated as-of date. The registration certificate’s validity ended on 25/07/2024, and the supplied documents do not include an extension or an occupancy/completion certificate. These records establish what was filed, not the building’s current on-site construction or completion status. RERA unit table RERA unit details Document index

Master plan, architecture & building design

The project-specific GHMC building documents describe one residential building, “PROPO BLDG (RESIDENCE),” on Survey No. 307/E/A, with a stilt level and five upper floors. The building-plan extraction records 14.90 m building height and 20.15 m total height. It also records proposed coverage area as 251.85 sq m (48.07%), total built-up area as 1511.13 sq m, and residential net BUA as 1259.27 sq m. These are separate measures as labelled in that plan; no carpet-area or FSI figure is supplied.

The permit extraction records 1,259.25 sq m for residential upper floors and 240.09 sq m for the stilt. The supplied documents do not provide verified detail on the number of flats per floor, lift or stair count, detailed circulation, landscaping area, or phase-wise organization.

A separate uploaded layout-plan document describes a previous and final plotted layout in Sy. No. 3-71(8), Gajula Kumaran Village, Gutibullaur Mandal, R.R. District. It does not identify Lacasa CABEZA or provide an approval authority, permit number, or approval date in the available extraction; it is therefore not used to describe this project’s approved building arrangement.

Homes, configurations & floor plans

The RERA record lists ten three-bedroom units, all shown as available and none booked in the portal data last read. Its filed saleable area is 62.98 sq m per unit. The portal data has no stated as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK (“THREE BEDROOM”)1001062.98 sq mNot available: no unit design was measured from the supplied floor-plan drawings.Not supplied

The supplied floor-plan review notes two drawings in total, one measured and one awaiting scan, but records zero measured 3BHK flat designs and no carpet-area result. Therefore, no drawing-based room dimensions or carpet-area measurements can be reported. RERA-filed saleable area is the available unit-area disclosure; the supplied record does not provide a separate carpet-area or loading figure. Floor plans RERA unit details

Parking & vehicle circulation

The GHMC permit extraction says the cellar and stilt approved in the plan are to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. The building-plan extraction records “Proposed Number of Parkings 0,” so a sanctioned parking-space count cannot be established from the available material. No visitor, accessible, two-wheeler, mechanical or EV-charging provision, parking allotment schedule, or unit-specific parking allocation is supplied.

The building-plan conditions require one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m. The documents do not provide a detailed ramp or internal-driveway plan.

Amenities, recreation & open spaces

The RERA amenity record contains the following disclosures. Its progress figures are portal-recorded values, not independent confirmation that facilities are present or complete. RERA amenities

Tot-lot / green strip
Description / sizeTot-lot is required by the GHMC permit; the permit also requires periphery greenery. No size is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Aggregate recreational open space
Description / sizeNo area supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Community buildings
Description / sizeNo facility details or size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Water conservation / rainwater harvesting
Description / sizePermit requires a rainwater-harvesting structure (percolation pit); permit extraction records five RWHPs.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: “YES,” 100%; this is a filed progress disclosure, not independent verification.
Electrical meter room / sub-station / receiving station
Description / sizePermit requires space for a transformer.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: “YES,” 100%; independent verification not supplied.
Internal roads and footpaths
Description / sizeDetails and dimensions not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Water supply
Description / sizeDetails not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Sewerage / sewage and sullage treatment
Description / sizeDetails not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Storm-water drains
Description / sizeDetails not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Solid-waste management and disposal
Description / sizeDetails not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Street lighting
Description / sizeDetails not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Energy management
Description / sizeDetails not supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independently verified status not supplied.
Fire protection and fire safety
Description / sizePermit places responsibility for fire-safety requirements on the owner, builder/developer, architect and site engineer; no system specification is supplied in the RERA amenity record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; independent verification not supplied.

Utilities, building services & safety

The GHMC building-plan conditions require a separate underground static water-storage tank of 25,000 litres and a separate 25,000-litre terrace tank for the residential building. They also require a generator as an alternate electricity source and emergency lighting in corridors, common passages and staircases. These are sanctioned conditions; the supplied record does not verify installation or operation.

The permit requires a rainwater-harvesting percolation pit and records five RWHPs. It also requires space for a transformer and a garbage house. The RERA amenity register marks water conservation/rainwater harvesting and the electrical meter room/sub-station/receiving-station item “YES” at 100%, while recording 0% for sewerage, treatment and disposal, storm-water drains, water supply and solid-waste management; these are portal disclosures, not site verification. RERA amenities

The approved-plan conditions also require fire-resistant swing doors for collapsible lifts, emergency lighting and, if basement area exceeds 200 sq m, an automatic sprinkler system. No lift count or capacity, detailed fire-system installation record, sewage-treatment capacity, water source, accessibility provision, CCTV or access-control specification is supplied.

Location, access & connectivity

The registered project location is Gajula Ramaram, Medchal-Malkajgiri district, Telangana 500072, on Survey No. 307/E/A. The RERA land record identifies plots 145P, 146 and 147. The building-plan document records the site as Gajularamaram, Qutbullapur mandal, and identifies R.K. Township as the road/street; it also records a 40-foot south boundary road and an 18 m road reference in the building-permit conditions. RERA record RERA filing

The supplied location record gives the cadastral parcel centroid as 17.41528, 78.35459. No project-linked public-transport details or verified travel distances to landmarks are supplied. Location record

Developer & development status

The TG-RERA certificate names Sudheer Kumar Gangireddy as the registered promoter. The RERA record describes the promoter organization as “Others,” with the description “Individuals”; a company or other separate legal-entity type is not identified. The certificate gives a promoter-office address in Hyderabad, PIN 500036, while the project record lists an address at Doctor Residency, Shalivahana Nagar, R.K. Layout Incois Road, Gajula Ramaram, Medchal-Malkajgiri, 500072. Corporate record RERA filing Parties record

The Form B filed on 9 April 2019 names G. Krishna Mohan Reddy and others as declarants, including G. Sudheer Kumar, and states an undertaking to complete the project by 3/4/2021. The RERA registration record separately gives proposed completion as 25/07/2024. No construction-stage certification, current completion schedule, extension order, or occupancy/completion certificate is supplied. RERA record Document index

Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeP02200001888; Lacasa CABEZA; Survey No. 307/E/A
Available evidenceForm C certificate records registration from 21/03/2020 to 25/07/2024 and conditions including the separate-account requirement.
GHMC building permit order
Reference and scopeApproval No. 2/C26/12392/2018; file No. 2/15B/07550/2018; dated 25 July 2018; Survey No. 307/E/A
Available evidencePermit order for a proposed residential building, Stilt + 5 floors, on 523.95 sq m.
GHMC building-plan details
Reference and scopeApproval No. 2/C26/12392/2018; application No. 2/15B/07550/2018; dated 26-07-2018
Available evidencePlan records ten dwelling units and building-area and height particulars.
Form B declaration
Reference and scopeDated 9 April 2019
Available evidencePromoter declaration covering title, encumbrances, project funds, approvals and completion undertaking.
Title documents and title opinion
Reference and scopeSurvey No. 307/E/A
Available evidenceRERA-filed sale-deed extracts and advocate’s title-search report are available for review.
Encumbrance statement
Reference and scopeProject filing
Available evidenceFiled encumbrance statement is available; it is not a current certificate.
Occupancy / completion certificate
Reference and scopeProject building
Available evidenceNot included in the supplied document set. Document index
Separate uploaded layout plan
Reference and scopeSy. No. 3-71(8), Gajula Kumaran Village
Available evidenceExtraction does not identify an approval authority, permit number or approval date, and does not link the plan to the project site.

Due-diligence summary

Risk & red flags

1 high
  • Completion date has passed and the project is not complete
Full details: coming soon

Land & title

Nothing confirmed
  • Land record and title documents checked.
  • Nothing confirmed found in records checked.
Searched: Bhu Bharati land record, IGRS registration records, title documents
Full details: coming soon

Approvals

Not in filing
  • No plan approval number in the RERA filing.
Searched: RERA filing, HMDA/DTCP/GHMC approvals
Full details: coming soon

Legal

Searched
  • Court and regulator records searched for this project.
  • No TG-RERA proceedings found.
Searched: eCourts, High Court, consumer forums, TG-RERA orders
Full details: coming soon

Contacts

  • Promoter: Sudheer Kumar Gangireddy (RERA filing).
  • Architect, engineer and other filed contacts in the full file.
Full details: coming soon

More projects in Medchal-Malkajgiri

Frequently asked questions

Is Lacasa CABEZA registered with Telangana RERA?

Yes. Lacasa CABEZA is registered with the Telangana Real Estate Regulatory Authority as P02200001888; the registration status is New Project.

Who is the developer of Lacasa CABEZA?

The promoter named in the RERA registration is Sudheer Kumar Gangireddy.

Where is Lacasa CABEZA located?

Lacasa CABEZA is in gajula ramaram, Medchal-Malkajgiri, Telangana (500072).

When will Lacasa CABEZA be completed?

The promoter's proposed date of completion filed with RERA is 25/07/2024. This is the promoter's declaration, not a guarantee.