Lotus Vinayaka
LOTUS VINAYAKA is a plotted development in Ghanpur, Ghnapur (Mulug) mandal, Jayashankar district, developed by registered promoter Billakanti Achintya Rao. The registered site area is 40,030.20 sq. m., and the revised draft layout describes 118 plots; floor configurations are not applicable. The project is registered with TG-RERA as P00500007238, with a proposed completion date of 24-08-2025.
At a glance
- RERA registration
- P00500007238
- Registration valid
- 09/11/2023 to 24/08/2025; the supplied certificate says it is not extended. Registration validity is distinct from the completion date.
- Promoter
- Billakanti Achintya Rao, as named on the TG-RERA certificate.
- Site area
- Total and net area: 40,030.20 sq. m.
- Building permit
- Director of Town and Country Planning, Government of Telangana; the document states the layout is delegated to Ghanpur Gram Panchayat.
- Booked / available
- Not available in the supplied evidence.
- Construction stage
- RERA header records 70% completeness; this is a filed progress figure, not independent site verification.
- Occupancy certificate
- No occupancy or completion certificate is supplied. For this plotted layout, the supplied material instead includes a revised draft layout pattern
The full project file
Description
Lotus Vinayaka is a plotted development in TG-RERA’s New Project category, with 40,030.20 sq m of land and a proposed completion date of 24 August 2025.
- Project type
- Plotted DevelopmentRERA filing
- Land area
- 40030.20 sq mRERA filing
- Possession
- 24/08/2025RERA filing
- Status
- New ProjectRERA filing
Configurations & sizes
The project is a plotted development; plot-level carpet area measured from approved drawings is not available because the drawings have not been measured. The developer’s marketing lists 25,097.80 sq m as built-up area and 40,030.20 sq m as saleable area; the TG-RERA filing’s unit, booking and saleable-area figures are not disclosed.
| Type | Built-up | Saleable | Source |
|---|---|---|---|
| Plotted Development | 25097.80 | 40030.20 | aurumproptech |
Amenities
The disclosed amenities include landscaped open space and basic site infrastructure.
- Green Strip/TOT LOT/Park
- Aggregate area of recreational Open Space
- Open Parking
Specifications
- Approving Authority
- DTCP
- Project Status
- Completed
Location & connectivity
The project is opposite the Agriculture Society Building in Ghanpur village, Ghnapur (Mulug) mandal, Jayashankar district, Telangana. The filing records a 33-foot-wide road along its eastern boundary.
Promoter
The promoter is BILLAKANTI, an individual. The named architect is M. Koushik, and the named structural engineer is Shaik Mashooq Rabbani.
Sources & web results
- Lotus Vinayaka Ghanpur, Hyderabad99acres.com
- Lotus Vinayaka FAQs99acres.com
- LOTUS VINAYAKA Medchal-Malkajgiri – RERA No. ...aurumproptech.in
- LOTUS VINAYAKA | undefined | Ghanapur | Photos & Reviewsbhumiboss.com
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- LOTUS VINAYAKA
- Developer / Promoter
- BILLAKANTI
- Project type
- Plotted Development
- RERA Registration No.
- P00500007238
- Registration Status
- New Project
- Approved on
- 24/08/2023
- Proposed completion
- 24/08/2025
- Approving authority
- DTCP
- Total site area
- 40,030 sq m (9.9 acres)
- Approved built-up area
- 25,098 sq m (6.2 acres)
- Locality
- GHANPUR VILLAGE & MANDAL, Ghanpur
- Mandal
- Ghnapur (Mulug)
- District
- Jayashankar Bhupalpally
- PIN code
- 506345
- Documents on File
- 19
Frequently asked questions
Is LOTUS VINAYAKA registered with Telangana RERA?
Yes. LOTUS VINAYAKA is registered with the Telangana Real Estate Regulatory Authority as P00500007238; the registration status is New Project.
Who is the developer of LOTUS VINAYAKA?
The promoter named in the RERA registration is BILLAKANTI.
Where is LOTUS VINAYAKA located?
LOTUS VINAYAKA is in GHANPUR VILLAGE & MANDAL, Ghanpur, Ghnapur (Mulug), Jayashankar Bhupalpally, Telangana (506345).
When will LOTUS VINAYAKA be completed?
The promoter's proposed date of completion filed with RERA is 24/08/2025. This is the promoter's declaration, not a guarantee.