thePropCheck AI property due diligence
Sign in

Mpg Enclave 3

MPG ENCLAVE 3 is a plotted residential layout in MALKAPUR, KONDAPUR, Sangareddy District. The TG-RERA certificate names Mr./Ms. Myadam Sudha Rani as the registered promoter. The final-layout document states an extent of Ac. 1.525 Cents; 7381.00 Sq. Yds. and 14 plots; plot configurations and building floors are not disclosed. Its TG-RERA registration is P01100003460, and the promoter’s Form-B undertaking gives a completion date of 27th August 2023.

At a glance

RERA registration
P01100003460
Registration valid
24/09/2021 to 27/08/2023; certificate states validity may be extended by the Authority. The supplied certificate records no extension.
Promoter
Mr./Ms. Myadam Sudha Rani on the TG-RERA certificate; Form-B identifies Myadam Sudha Rani as authorised signatory. Legal entity type is not disclosed.
Building permit
District Town and Country Planning Officer, Sangareddy District; the layout documents record delegation to Malkapur Grampanchayat.
Booked / available
Not disclosed in the supplied project evidence.
Construction stage
No independently verified current site-progress record is supplied. The promoter’s Form-B undertook completion by 27th August 2023.

The full project file

🔒 Title & legal checks
Title and legal checks are available for this project.
To see the full title details and any court records, please sign in

Description

MPG Enclave 3 is a plotted development in Malkapur, recorded as a new project in its TG-RERA filing. The filing records 5806.41 sq m of land and a proposed completion date of 27/08/2023.

Project type
Plotted DevelopmentRERA filing
Land area
5806.41 sq mRERA filing
Possession
27/08/2023RERA filing
Status
New ProjectRERA filing

Configurations & sizes

The developer advertises 3 and 4 BHK homes with built-up areas of 1,561–4,224 sq ft, and plots with a saleable area of 1,435 sq ft. Carpet area measured from approved drawings is not available; no TG-RERA unit, booking or saleable-area figures are provided in the digest.

TypeBuilt-upSaleableSource
3 & 4 BHK1,561 - 4,224 sq fthousing
Plot1,435 sq ftproptiger

Amenities

Filed infrastructure includes roads, water supply, sewerage, storm-water drains, street lighting and rainwater harvesting; the filing also lists a park, full power backup and fire sprinklers.

3 amenities
  • Green Strip/TOT LOT/Park
  • Full Power Backup
  • Fire Sprinklers

Location & connectivity

The project is in Malkapur, Kondapur mandal, Sangareddy district; the developer's marketing describes the location as Malkapur, Hyderabad.

MALKAPUR, KONDAPUR, Sangareddy
📍 Open in Maps

Promoter

The TG-RERA filing names the promoter as myadam, an individual, and the digest records two other registered projects. The named architect is Mohammed Sabahath Ruman and the structural engineer is Shaik Muneer Hussain.

myadam
2 other projects on record

Additional details

Launched Aug'21proptiger

Sources & web results

Fallback
Property portals
Published by third parties — verify before relying on them.

Public RERA registration record

Telangana RERA, as filed by the promoter.

Registered name
MPG ENCLAVE 3
Developer / Promoter
myadam
Project type
Plotted Development
RERA Registration No.
P01100003460
Registration Status
New Project
Approved on
28/08/2021
Proposed completion
27/08/2023
Approving authority
DTCP
Total site area
5,806 sq m (1.4 acres)
Approved built-up area
3,732 sq m (0.9 acres)
Locality
MALKAPUR, MALKAPUR
Mandal
KONDAPUR
District
Sangareddy
PIN code
502295
Documents on File
19

Frequently asked questions

Is MPG ENCLAVE 3 registered with Telangana RERA?

Yes. MPG ENCLAVE 3 is registered with the Telangana Real Estate Regulatory Authority as P01100003460; the registration status is New Project.

Who is the developer of MPG ENCLAVE 3?

The promoter named in the RERA registration is myadam.

Where is MPG ENCLAVE 3 located?

MPG ENCLAVE 3 is in MALKAPUR, KONDAPUR, Sangareddy, Telangana (502295).

When will MPG ENCLAVE 3 be completed?

The promoter's proposed date of completion filed with RERA is 27/08/2023. This is the promoter's declaration, not a guarantee.

More projects in Malkapur