Rr Residency South Block
RR RESIDENCY SOUTH BLOCK is a residential apartment project in Kanteshwar, Nizamabad district; the mandal is not disclosed in the supplied project identity record. The registered promoter is AASHRITHA DEVELOPERS. The site area is 2718.92 sq. m, and the project has one building, identified in the building-permit document as Block B, with 1 Stilt + 5 upper floors and 45 homes; the RERA-filed configuration is 3BHK, with a saleable area of 115.27 sq. m. It is registered under TG-RERA number P03100003717, and the promoter’s Form-B undertaking gives 02-10-2025 as the proposed completion date.
More from Aashritha Developers · 2 projects →
At a glance
- RERA registration
- P03100003717; registration certificate issued 03/12/2021, valid through 02/10/2025. The certificate records no extension.
- Promoter
- AASHRITHA DEVELOPERS (also styled “M/s. AASHRITHA DEVELOPERS” in filed documents).
- Site area
- RERA land record: total and net area 2718.92 sq. m. The building-permit parameters separately state Site Area 2718.92 m² and Net Area 2714.17 m².
- Building permit
- Nizamabad Urban Development Authority.
- Construction stage
- No independent site-progress verification or project occupancy/completion certificate is supplied. The permit requires an Occupancy Certificate before occupation.
The full project file
Description
The project is a residential apartment development with 45 units in one tower of five floors, on 2,718.92 sq m of land. Its TG-RERA status is “New Project,” with proposed completion recorded as 2 October 2025.
- Project type
- Residential (apartment)RERA filing
- Units
- 45RERA filing
- Towers
- 1RERA filing
- Floors
- 5RERA filing
- Land area
- 2718.92 sq mRERA filing
- Possession
- 02/10/2025RERA filing
- Status
- New ProjectRERA filing
Configurations & sizes
The 3BHK carpet area measures 87.5–108.0 sq m from the approved drawings; this drawing-based measurement is not a RERA disclosure and should be verified against the drawings. The TG-RERA filing records 45 3BHK units, 6 booked, with a saleable area of 115.27 sq m.
| Type | Saleable | Source |
|---|---|---|
| 3BHK | 115.27 sq m | RERA filing |
Amenities
The displayed amenities include open and covered parking, alongside water supply, sewerage and rainwater harvesting.
- open parking
- covered parking
Location & connectivity
The project is in Gangasthan Phase-I, Kanteshwar Shivar, Kanteshwar, Nizamabad, Telangana.
Promoter
The promoter is AASHRITHA DEVELOPERS, a partnership. One other registered project is recorded; the official website and named architect and engineer are not included here.
Sources & web results
- Aashritha RR Residency South Block Kanteshwar ...99acres.com
- RR RESIDENCY SOUTH BLOCK | 3BHK | Kanteshwarbhumiboss.com
- Flats for Rent in Aashritha RR Residency South Blockhousing.com
- Aashritha RR Residency South Block Kanteshwar, Nizamabad ...ghar.tv
- Aashritha RR Residency South Block FAQs99acres.com
- RR RESIDENCY SOUTH BLOCK Nizamabad – RERA No. ...aurumproptech.in
Public RERA registration record
Telangana RERA, as filed by the promoter.
- Registered name
- RR RESIDENCY SOUTH BLOCK
- Developer / Promoter
- AASHRITHA DEVELOPERS
- Project type
- Residential
- RERA Registration No.
- P03100003717
- Registration Status
- New Project
- Approved on
- 02/03/2021
- Proposed completion
- 02/10/2025
- Approving authority
- DTCP
- Total site area
- 2,719 sq m (0.7 acres)
- Approved built-up area
- 7,900 sq m (2.0 acres)
- Buildings (approved plan)
- 1
- Locality
- KANTESHWAR
- District
- Nizamabad
- PIN code
- 503002
- Documents on File
- 9
Frequently asked questions
Is RR RESIDENCY SOUTH BLOCK registered with Telangana RERA?
Yes. RR RESIDENCY SOUTH BLOCK is registered with the Telangana Real Estate Regulatory Authority as P03100003717; the registration status is New Project.
Who is the developer of RR RESIDENCY SOUTH BLOCK?
The promoter named in the RERA registration is AASHRITHA DEVELOPERS.
Where is RR RESIDENCY SOUTH BLOCK located?
RR RESIDENCY SOUTH BLOCK is in KANTESHWAR, Nizamabad, Telangana (503002).
When will RR RESIDENCY SOUTH BLOCK be completed?
The promoter's proposed date of completion filed with RERA is 02/10/2025. This is the promoter's declaration, not a guarantee.