thePropCheck AI property due diligence
Sign in

Sark Green Life Space

Sark Projects India Private Limited · Rangareddy · RERA P02400001726

Sark Green Life Space is a residential plotted development in Masjid Banda, Serilingampally Mandal, Ranga Reddy District. It is being developed by the registered promoter, Sark Projects India Private Limited. The site area is 58,269.12 sq. m, and the drawing-derived record identifies 109 plot numbers (1 to 109); a complete plot-size schedule is not supplied. The project is registered under TG-RERA number P02400001726, with proposed completion listed as 23/08/2022.

More from Sark Projects India Pvt Ltd · 8 projects →

1. Project at a glance

Project identity

Registered project name: Sark Green Life Space

Project type: Plotted development / residential open-plot layout

Phase / registered portion: A single registered project is identified; a separate phase designation is not disclosed. The registration covers the listed project land.

TG-RERA registration number: P02400001726

Registration validity: 18/02/2020 to 23/08/2022; the certificate says extension is possible if granted by the Authority. The supplied record marks the registration as not extended. Registration validity is separate from completion and occupancy status.

Registered promoter: Sark Projects India Private Limited

RERA-record status: The project record identifies the project as “New Project”; the registration certificate’s validity ended on 23/08/2022.

Land and geographic identity

Locality: Masjid Banda

Revenue village: Mokila Village is named in the layout approval and registration documents. The RERA identity fields also state Kondapur as village; the supplied materials do not resolve this difference here.

Mandal: Serilingampally in the project identity and RERA certificate; the HMDA layout letter identifies Shankarpalle Mandal.

District / PIN: Ranga Reddy / 500084

Project survey numbers: 156p, 162p, 163p, 209p, 210, 211, 212, 215, 216p

Site extent: Total site area: 58,269.12 sq. m; road-widening affected area: 320.19 sq. m; net layout area: 57,948.93 sq. m. The final layout letter records 57,948.93 Sqm.

Boundaries: East: Existing Nala; west and south: Land of Others; north: Proposed 40 feet Road.

Development identity

Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the final layout letter also records delegation to Mokila Village and Grampanchayat.

Principal final layout approval: 000308/LO/Plg/HMDA/2019, Final Layout Letter dated 17 August, 2022.

Approved area: The final layout letter records an extent of 57,948.93 Sqm. The RERA land record states approved built-up area of 57,948.93 sq. m; this is the filed figure and is not a building floor-area specification.

Layout organization: The drawing-derived record identifies 109 plot numbers (1 to 109); plot count and sizes are software-read from the drawing and require drawing-level verification.

Buildings / floors: Building count, sanctioned floor configuration and parking levels are not disclosed in the supplied record. The approval describes a residential open-plot layout; individual building permissions are to be considered separately.

Approved versus RERA-declared unit counts: No RERA configuration/unit-count schedule is supplied. The drawing-derived layout record identifies 109 plots, but does not provide a complete plot-size schedule.

Offering and status

Offering: Residential plots in an open-plot layout. No plot-size range or complete plot schedule is available in the supplied records.

Booked / available: Not disclosed in the supplied evidence.

Construction / infrastructure stage: TG-RERA amenity entries report 75% for internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park, street lighting, water conservation/rainwater harvesting and electrical meter room/sub-station/receiving station. These are promoter-reported progress figures, not independent site verification.

Completion dates: RERA registration certificate validity ended 23/08/2022. The project information field lists proposed completion as 23/08/2022. A Form 1A architect certificate records a completion date of 08/08/2024; the supplied evidence does not establish an authority-issued occupancy certificate for the layout.

Occupancy / completion certificate status: Form 1A is an architect’s completion certificate for the registered project; it is not itself shown in the supplied record as an HMDA-issued occupancy/completion certificate. The final layout approval is documented separately.

2. The project story

  • Sark Green Life Space is presented in the TG-RERA file as a residential plotted development at the stated project surveys, with HMDA’s final layout letter identifying the site at Mokila Village. The project’s land record also gives Kondapur as the village and identifies Masjid Banda as the locality; those are reproduced as filed rather than treated as a resolved cadastral location.
  • The sanctioned layout is a residential open-plot layout, not an apartment or villa scheme. The drawing-derived record identifies plots numbered 1 through 109 and allocates land to plots, roads, parks/open space and social infrastructure. Individual building permissions are to be considered separately under the approval conditions. The supplied material does not establish that any particular plot has a permitted building, or provide a complete plot-size schedule.
  • A Form 1A architect certificate states overall project completion and gives 08/08/2024 as the completion date. Separately, the TG-RERA amenity entries show selected infrastructure items at 75% progress. These are different types of evidence: the progress percentages are reported in the RERA amenity record, while Form 1A is an architect’s certification; neither is presented here as an independently inspected site assessment or as an authority-issued occupancy certificate.

3. Master plan, architecture & building design

  • The final layout letter records a net layout extent of 57,948.93 Sqm. The drawing-derived area statement allocates 35,130.08 sq. m to plots, 15,586.89 sq. m to roads, 5,779.95 sq. m to parks/open space and 1,450.90 sq. m to social infrastructure; the drawing’s area statement also records amenity area as 0.00 sq. m. These figures describe the layout land-use split, not building floor area. The plot count and sizes were read from drawing text and should be checked against the approved drawing.
  • The approved layout letter identifies a residential use and states that individual building permissions will be considered separately. It also requires roads to remain open for public access, prohibits compound walls, and specifies a minimum 3m (10’0”) safety distance from high-tension electricity lines. The supplied evidence does not state a building count, building footprint, number of floors, height for a particular building, or apartment-style internal design features.
  • The approval documents reference roads and open spaces transferred to the local authority by registered gift deed 730/2022 dated 31.01.2022, and relinquishment deed 3871/2022 dated 22.07.2022 for mortgaged plots. The layout record identifies the mortgaged area as 5,810.24 sq. m, in plots 89 to 96 and 100 to 106; the approval documents describe this as a layout condition.

4. Homes, configurations & floor plans

This is a plotted layout, so apartment configuration, RERA saleable area, measured carpet area and loading are not applicable on the supplied evidence. The file identifies plot numbers 1–109, but does not include a complete plot-size schedule or booked/available inventory. Plot count and sizes are software-read from the layout drawing and require verification against the drawing.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots109 plot numbers identified on drawing (1–109); size schedule not suppliedNot disclosedNot disclosedNot disclosedNot applicableNot supplied

The supplied drawing-processing record lists two layout sheets; the separate floor-plan record contains no measured floor-plan area and does not provide apartment plans.

5. Parking & vehicle circulation

  • The evidence does not disclose a sanctioned parking-space count, visitor or accessible parking provision, parking allocation by plot, or parking arrangement for future individual buildings. No parking levels or ramp details are available for this plotted development.
  • The layout drawing identifies roads, including a 12.00 mt. (40) road, and the approval requires roads to remain open for public access. A drawn or reserved layout area does not, by itself, establish an exclusive parking allocation for a buyer.

6. Amenities, recreation & open spaces

The final layout approval lists water supply, sewerage, drainage-disposal systems, street lighting, rainwater-harvesting structure and civic amenities. The RERA amenity record separately reports infrastructure progress; those percentages are promoter-reported, not independently verified completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsLayout infrastructure; no length or area supplied75% reported in RERA amenity record; not independently verified
Water supplyListed as a layout service; no source or capacity supplied75% reported; not independently verified
SewerageRERA entry refers to chambers, lines, septic tank and STP; approval lists sewerage and drainage-disposal systems75% reported for sewerage entry; treatment/disposal entry is 0%
Storm-water drainsLayout drainage infrastructure; no capacity supplied75% reported; not independently verified
Green strip / tot lot / parkDrawing-derived parks/open space: 5,779.95 sq. m75% reported for green strip/tot lot/park; not independently verified
Street lightingLayout service; no fixture count supplied75% reported; not independently verified
Rainwater harvesting / water conservationApproval lists a rainwater-harvesting structure75% reported; not independently verified
Community buildingsNo description or size supplied0% reported
Solid-waste management and disposalNo facility size or capacity supplied0% reported
Electrical meter room / sub-station / receiving stationListed as a layout facility; no capacity supplied75% reported; not independently verified
Social infrastructure1,450.90 sq. m in the drawing-derived layout area statementNo completion percentage supplied

No clubhouse, indoor recreation facility or sports facility is identified in the supplied project evidence. The layout record reports aggregate recreational open space at 0%, while the drawing-derived land-use statement records parks/open space; these are retained as separate supplied records, without inferring delivery status.

7. Utilities, building services & safety

  • The final layout approval lists water supply, sewerage, drainage-disposal systems, street lighting, rainwater harvesting and civic amenities. It does not give capacities, operating status or independent commissioning evidence. The RERA amenity record reports 75% progress for water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting and the electrical meter room/sub-station/receiving station.
  • The supplied approval-intimation document sets out requirements concerning a potable-water connection, sewerage treatment or septage treatment, underground storm-water drainage, utility ducting, a transformer yard, LED street lighting, solid-waste segregation and disposal, and fire-service norms. These are stated as approval conditions/instructions; the supplied material does not establish their completed installation or statutory clearance.
  • No documented system capacities are supplied for water storage or treatment, STP, electrical supply or backup, fire equipment, security, accessibility, or waste processing. No lift or building-service details are applicable to the evidence for this plotted layout.

8. Location, access & connectivity

  • The project is identified as being in Masjid Banda, with the layout approval naming Mokila Village, Ranga Reddy District. The RERA identity and registration certificate also state Kondapur Village and Serilingampally Mandal. The registered PIN is 500084. The supplied records do not provide a resolved revenue-village identification beyond these recorded entries.
  • The layout boundary description gives an existing nala to the east, land of others to the west and south, and a proposed 40 feet road to the north. The approval and drawing records refer to layout roads, including a 12.00 mt. (40) road. The only supplied connectivity distance is HITEC City — 5.6 km; no travel time or public-transport information is provided.

9. Developer & development status

  • The registered legal promoter is Sark Projects India Private Limited, a company. The registration certificate gives the promoter office as Village: Maseed Banda, Mandal: Serilingampally, District: Ranga Reddy, PIN 500084. The supplied corporate record identifies directors Smitha Reddy Katta and Sarin Katta, with Sarin Katta also listed as an authorised signatory.
  • The RERA record lists proposed completion as 23/08/2022; the registration certificate was valid to that date and the supplied record says it was not extended. The Form 1A architect certificate records completion dated 08/08/2024. These dates describe, respectively, the project’s declared completion timeline, registration validity and architect’s completion certification; they do not establish an authority-issued occupancy certificate.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001726; issued 18/02/2020, valid to 23/08/2022
What the supplied record establishesForm C registration of Sark Green Life Space under section 5; registration conditions include a separate-account requirement.
HMDA final layout approval
Identifier / date000308/LO/Plg/HMDA/2019; 17 August, 2022
What the supplied record establishesFinal residential open-plot layout letter for the stated survey numbers and 57,948.93 Sqm.
Layout proceeding / file reference
Identifier / date052316/LT/SKP/FLT/U6/HMDA/10022022
What the supplied record establishesReference identified in the final layout letter and the architect’s Form 1A certificate.
Commencement-related letter
Identifier / date28.01.2020
What the supplied record establishesDocument titled “Commencement Certificate / No objection certificate” and “Releasing of Draft Layout Permission,” addressed to Mokila Village and Grampanchayat, concerning the proposed open-plot development.
Architect’s Form 1A
Identifier / dateProject registration P02400001726; completion date 08/08/2024
What the supplied record establishesArchitect’s certificate states overall completion of the registered project; it is not shown in the supplied record as an authority-issued occupancy/completion certificate.
HMDA drawing / layout record
Identifier / dateDrawing document 80258, two sheets
What the supplied record establishesDrawing-derived layout information, including plot numbering and land-use figures; software-read plot data should be checked against the drawing.
RERA Form B declaration
Identifier / dateDocument 84901
What the supplied record establishesPromoter directors’ declaration concerning title, encumbrances, completion, project funds and approvals.

Due-diligence summary

Risk & red flags

No risks found
  • No high or medium risks found in records checked.
Full details: coming soon

Land & title

Nothing confirmed
  • Land record and title documents checked.
  • Nothing confirmed found in records checked.
Searched: Bhu Bharati land record, IGRS registration records, title documents
Full details: coming soon

Approvals

Not in filing
  • No plan approval number in the RERA filing.
Searched: RERA filing, HMDA/DTCP/GHMC approvals
Full details: coming soon

Legal

Searched
  • Court and regulator records searched for this project.
  • No TG-RERA proceedings found.
Searched: eCourts, High Court, consumer forums, TG-RERA orders
Full details: coming soon

Contacts

  • Promoter: Sark Projects India Private Limited (RERA filing).
  • Architect, engineer and other filed contacts in the full file.
Full details: coming soon

More projects in Kondapur

Frequently asked questions

Is Sark Green Life Space registered with Telangana RERA?

Yes. Sark Green Life Space is registered with the Telangana Real Estate Regulatory Authority as P02400001726; the registration status is New Project.

Who is the developer of Sark Green Life Space?

The promoter named in the RERA registration is Sark Projects India Private Limited.

Where is Sark Green Life Space located?

Sark Green Life Space is in Masjid Banda, Kondapur, Serilingampally, Rangareddy, Telangana (500084).

When will Sark Green Life Space be completed?

The promoter's proposed date of completion filed with RERA is 23/08/2022. This is the promoter's declaration, not a guarantee.